A platform for research: civil engineering, architecture and urbanism
Attached lifting scaffold for super high-rise building
The invention discloses an attached lifting scaffold for a super high-rise building. The attached lifting scaffold for the super high-rise building comprises an attached support and a fastener, wherein the attached support is fixed onto a poured concrete wall through the fastener; the attached support is connected with a guide rail on the scaffold; the fastener comprises a bolt and a nut matched with the bolt; one end face of the nut extends in the axial direction to form a limiting ring; a stop lever is arranged in the limiting ring; one end of the stop lever is connected into the limiting ring; and the other end of the stop lever abuts against the threaded surface of the bolt. The attached support is installed through the fastener, the stop lever prevents the nut from falling off in the installation process, and the fastener can be better prevented from loosening after installation is completed; and in addition, Rafah nodes of the attached lifting scaffold during first attachment are raised, so that the stability of a scaffold body during installation is improved, the problem that a guide seat of the attached lifting scaffold and an aluminum mold are installed and dismounted on the same layer in the climbing process is solved, the construction progress is accelerated, and the construction period is shortened.
本发明公开了一种超高层建筑附着式升降脚手架,包括包括,附着支座,所述附着支座通过紧固件固定在已浇筑砼墙,所述附着支座与脚手架上的导轨连接;紧固件,包括螺栓以及与所述螺栓配合的螺母;所述螺母一端面沿轴向延伸形成限位圈,所述限位圈内设置有挡杆,所述挡杆一端连接在所述限位圈内,另一端抵触在所述螺栓的螺纹表面;使用紧固件安装附着支座,安装过程中挡杆阻止螺母脱落,安装完成后也可以更好的防止紧固件松动;另外,提高附着式升降脚手架首次附着时的拉结点,提高安装时的架体稳定性,同时解决了爬升过程中附着式升降脚手架导座与铝模安拆同层的问题,施工的进度加快,工期缩短。
Attached lifting scaffold for super high-rise building
The invention discloses an attached lifting scaffold for a super high-rise building. The attached lifting scaffold for the super high-rise building comprises an attached support and a fastener, wherein the attached support is fixed onto a poured concrete wall through the fastener; the attached support is connected with a guide rail on the scaffold; the fastener comprises a bolt and a nut matched with the bolt; one end face of the nut extends in the axial direction to form a limiting ring; a stop lever is arranged in the limiting ring; one end of the stop lever is connected into the limiting ring; and the other end of the stop lever abuts against the threaded surface of the bolt. The attached support is installed through the fastener, the stop lever prevents the nut from falling off in the installation process, and the fastener can be better prevented from loosening after installation is completed; and in addition, Rafah nodes of the attached lifting scaffold during first attachment are raised, so that the stability of a scaffold body during installation is improved, the problem that a guide seat of the attached lifting scaffold and an aluminum mold are installed and dismounted on the same layer in the climbing process is solved, the construction progress is accelerated, and the construction period is shortened.
本发明公开了一种超高层建筑附着式升降脚手架,包括包括,附着支座,所述附着支座通过紧固件固定在已浇筑砼墙,所述附着支座与脚手架上的导轨连接;紧固件,包括螺栓以及与所述螺栓配合的螺母;所述螺母一端面沿轴向延伸形成限位圈,所述限位圈内设置有挡杆,所述挡杆一端连接在所述限位圈内,另一端抵触在所述螺栓的螺纹表面;使用紧固件安装附着支座,安装过程中挡杆阻止螺母脱落,安装完成后也可以更好的防止紧固件松动;另外,提高附着式升降脚手架首次附着时的拉结点,提高安装时的架体稳定性,同时解决了爬升过程中附着式升降脚手架导座与铝模安拆同层的问题,施工的进度加快,工期缩短。
Attached lifting scaffold for super high-rise building
一种超高层建筑附着式升降脚手架
HUANG YUXIN (author) / CHEN ZHOU (author) / LI JIALI (author) / LI JUN (author) / LU YANMING (author)
2021-08-06
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Super high-rise variable cross-section attached lifting scaffold
European Patent Office | 2024
|Super high-rise variable cross-section attached lifting scaffold
European Patent Office | 2023
|Construction method of attached lifting scaffold in variable cross-section super high-rise building
European Patent Office | 2020
|Construction method for inclined lifting of super high-rise twisted structure attached scaffold
European Patent Office | 2024
|