A platform for research: civil engineering, architecture and urbanism
Construction method of attached lifting scaffold in variable cross-section super high-rise building
The invention discloses a construction method of an attached lifting scaffold in a variable cross-section super high-rise building. According to the technical solution, the construction method is characterized by specifically comprising the following steps that S1, support cushion blocks are arranged at scaffold supports in the attached lifting scaffold; S2, the attached lifting scaffold is moved,so that a scaffold body of the attached lifting scaffold safely penetrates through the structure variable cross-section positions in the super high-rise building; S3, and after the scaffold body of the attached lifting scaffold completely penetrates through the variable cross-section positions, a tightener is installed at the position of the top support to fix the scaffold body of the attached lifting scaffold; and S4, and after the scaffold body of the attached lifting scaffold is fixed, the support cushion blocks except the bottom support are pulled out. The construction method of the attached lifting scaffold in the variable cross-section super high-rise building can solve the problem that the attached lifting scaffold needs to move in the horizontal direction when encountering the high-rise building, the application range of the attached lifting scaffold is widened, safety and reliability are achieved, and the engineering quality is guaranteed.
本发明公开了一种附着式升降脚手架在变截面超高层的施工方法,其技术方案要点是:具体包括以下步骤:S1、在附着式升降脚手架中的脚手架支座处设置支座垫块;S2、移动所述附着式升降脚手架使其架体安全穿越超高层建筑中的结构变截面处;S3、当所述附着式升降脚手架的架体完全穿越变截面后,在顶部支座处安装紧线器来固定附着式升降脚手架的架体;S4、当所述附着式升降脚手架的架体固定完成后抽出除底部支座以外的支座垫块;附着式升降脚手架在变截面超高层的施工方法可以解决附着式升降脚手架在遇到高层建筑需要进行水平向移动的问题,提高了附着式升降脚手架的使用范围,安全可靠,保证工程质量。
Construction method of attached lifting scaffold in variable cross-section super high-rise building
The invention discloses a construction method of an attached lifting scaffold in a variable cross-section super high-rise building. According to the technical solution, the construction method is characterized by specifically comprising the following steps that S1, support cushion blocks are arranged at scaffold supports in the attached lifting scaffold; S2, the attached lifting scaffold is moved,so that a scaffold body of the attached lifting scaffold safely penetrates through the structure variable cross-section positions in the super high-rise building; S3, and after the scaffold body of the attached lifting scaffold completely penetrates through the variable cross-section positions, a tightener is installed at the position of the top support to fix the scaffold body of the attached lifting scaffold; and S4, and after the scaffold body of the attached lifting scaffold is fixed, the support cushion blocks except the bottom support are pulled out. The construction method of the attached lifting scaffold in the variable cross-section super high-rise building can solve the problem that the attached lifting scaffold needs to move in the horizontal direction when encountering the high-rise building, the application range of the attached lifting scaffold is widened, safety and reliability are achieved, and the engineering quality is guaranteed.
本发明公开了一种附着式升降脚手架在变截面超高层的施工方法,其技术方案要点是:具体包括以下步骤:S1、在附着式升降脚手架中的脚手架支座处设置支座垫块;S2、移动所述附着式升降脚手架使其架体安全穿越超高层建筑中的结构变截面处;S3、当所述附着式升降脚手架的架体完全穿越变截面后,在顶部支座处安装紧线器来固定附着式升降脚手架的架体;S4、当所述附着式升降脚手架的架体固定完成后抽出除底部支座以外的支座垫块;附着式升降脚手架在变截面超高层的施工方法可以解决附着式升降脚手架在遇到高层建筑需要进行水平向移动的问题,提高了附着式升降脚手架的使用范围,安全可靠,保证工程质量。
Construction method of attached lifting scaffold in variable cross-section super high-rise building
一种附着式升降脚手架在变截面超高层的施工方法
XU WEIXING (author) / SUN JICHAO (author) / HE ZHIGANG (author) / ZHU ZHAOGUO (author) / HAN SHANG (author) / JI XIAOLIANG (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Super high-rise variable cross-section attached lifting scaffold
European Patent Office | 2023
|Super high-rise variable cross-section attached lifting scaffold
European Patent Office | 2024
|Construction method of attached type lifting scaffold on step type variable cross-section building
European Patent Office | 2024
|