A platform for research: civil engineering, architecture and urbanism
Erecting equipment, erecting method and method for passing through uneven surface
The invention provides erecting equipment, an erecting method and a method for passing through uneven surfaces, and relates to the technical field of subway vehicle depot construction erection equipment. The erecting equipment is used for erecting an assembly type vehicle depot/station, the assembly type vehicle depot/station comprises a multi-layer structure, the erecting equipment comprises a main beam, a crane carriage, a supporting leg assembly and a cart walking mechanism, the crane carriage is movably arranged on the main beam, the crane carriage is used for hoisting a prefabricated box beam, the supporting leg assembly comprises a front supporting leg and a middle supporting leg which are arranged on the main beam, in a working state, the front supporting leg is higher than the middle supporting leg, the front supporting leg is suitable for standing on a lower-layer structure of the assembly type vehicle depot/station, the middle supporting leg is suitable for standing on an upper-layer structure of the assembly type vehicle depot/station, and the front supporting leg and the middle supporting leg are respectively in driving connection with one cart walking mechanism. According to the erecting equipment, assembly type construction is conducted on the metro depot through the equipment, and manpower, time and energy consumption cost can be greatly saved.
本发明提供了一种架设设备、架设方法及过高低不平面的方法,涉及地铁车辆段施工架设设备技术领域,所述架设设备用于架设装配式车辆段/车站,所述装配式车辆段/车站包括多层结构,所述架设设备包括:主梁;起重小车,移动设置于主梁上,起重小车用于吊运预制的箱梁;支腿组件,其包括设置于主梁上的前支腿和中支腿;当处于工作状态时,前支腿的高度大于中支腿的高度;前支腿适于站位在装配式车辆段/车站的下层结构上,中支腿适于站位在装配式车辆段/车站的上层结构上;大车走行机构,前支腿和中支腿分别与一个大车走行机构驱动连接。本发明的架设设备,通过该设备对地铁车辆段进行装配式施工,能够极大的节约人力、时间和能耗成本。
Erecting equipment, erecting method and method for passing through uneven surface
The invention provides erecting equipment, an erecting method and a method for passing through uneven surfaces, and relates to the technical field of subway vehicle depot construction erection equipment. The erecting equipment is used for erecting an assembly type vehicle depot/station, the assembly type vehicle depot/station comprises a multi-layer structure, the erecting equipment comprises a main beam, a crane carriage, a supporting leg assembly and a cart walking mechanism, the crane carriage is movably arranged on the main beam, the crane carriage is used for hoisting a prefabricated box beam, the supporting leg assembly comprises a front supporting leg and a middle supporting leg which are arranged on the main beam, in a working state, the front supporting leg is higher than the middle supporting leg, the front supporting leg is suitable for standing on a lower-layer structure of the assembly type vehicle depot/station, the middle supporting leg is suitable for standing on an upper-layer structure of the assembly type vehicle depot/station, and the front supporting leg and the middle supporting leg are respectively in driving connection with one cart walking mechanism. According to the erecting equipment, assembly type construction is conducted on the metro depot through the equipment, and manpower, time and energy consumption cost can be greatly saved.
本发明提供了一种架设设备、架设方法及过高低不平面的方法,涉及地铁车辆段施工架设设备技术领域,所述架设设备用于架设装配式车辆段/车站,所述装配式车辆段/车站包括多层结构,所述架设设备包括:主梁;起重小车,移动设置于主梁上,起重小车用于吊运预制的箱梁;支腿组件,其包括设置于主梁上的前支腿和中支腿;当处于工作状态时,前支腿的高度大于中支腿的高度;前支腿适于站位在装配式车辆段/车站的下层结构上,中支腿适于站位在装配式车辆段/车站的上层结构上;大车走行机构,前支腿和中支腿分别与一个大车走行机构驱动连接。本发明的架设设备,通过该设备对地铁车辆段进行装配式施工,能够极大的节约人力、时间和能耗成本。
Erecting equipment, erecting method and method for passing through uneven surface
一种架设设备、架设方法及过高低不平面的方法
YUAN ZHENHUA (author) / WU JUNMIN (author) / XIE JIWEI (author) / ZHANG DEQIANG (author) / ZHOU DI (author) / HU XUDONG (author) / LI ZHENXI (author) / WANG PENG (author) / WU ENZE (author) / FENG LIAN (author)
2021-08-10
Patent
Electronic Resource
Chinese
Bridge erecting machine and hole passing method of bridge erecting machine
European Patent Office | 2024
|Box beam erecting equipment, hole-passing method and tunnel-passing method
European Patent Office | 2020
|Full-assembly type bridge erecting system and beam erecting and hole passing method
European Patent Office | 2022
|Erecting mechanism, erecting device and bridge erecting vehicle
European Patent Office | 2021
|