A platform for research: civil engineering, architecture and urbanism
Construction method of peripheral limb constructional column of super high-rise building structure
The invention discloses a construction method of a peripheral limb constructional column of a super high-rise building structure, and belongs to the technical field of super high-rise buildings. The construction method comprises the following construction steps: 1, a constructional column mold is designed according to a constructional column to be constructed, the constructional column mold comprises a combed joint forming plate and an auxiliary side plate, after the combed joint forming plate and the auxiliary side plate define the mold, the combed joint forming plate is located on the inner side of the mold and can be matched with combed joints of a wall body; and 2, the main reinforcements are pre-buried on a lower beam, the main reinforcements are straightened, and stirrups are bound on the main reinforcements. According to the construction method, the constructional column with the combed joints is poured before the wall body is piled, then the wall body is piled on one sides of the combed joints of the constructional column, a hanging basket is not needed, the construction difficulty is reduced, safety is high, constructional column mold is detachable, assembling is easy, the constructional column mold can be repeatedly used, the construction cost is reduced, and the construction method is worthy of application and popularization.
本发明公开了超高层建筑技术领域的一种超高层建筑结构外围临边构造柱施工方法,包括以下施工步骤:步骤一:根据即将需要施工的构造柱设计构造柱模具,该构造柱模具包括马牙槎成型板和辅助侧板,马牙槎成型板和辅助侧板围成模具后,马牙槎成型板位于模具的内侧能够与墙体的马牙槎相配合;步骤二:主筋预埋在下梁上,将主筋顺直,并在主筋上绑扎箍筋,本发明在堆砌墙体之前先浇筑好带有马牙槎的构造柱,然后在构造柱的马牙槎一侧堆砌墙体,无需吊篮的使用,降低了施工的难度,安全性高,构造柱模具可拆卸,组装简单,能够反复使用,降低了施工成本,值得推广使用。
Construction method of peripheral limb constructional column of super high-rise building structure
The invention discloses a construction method of a peripheral limb constructional column of a super high-rise building structure, and belongs to the technical field of super high-rise buildings. The construction method comprises the following construction steps: 1, a constructional column mold is designed according to a constructional column to be constructed, the constructional column mold comprises a combed joint forming plate and an auxiliary side plate, after the combed joint forming plate and the auxiliary side plate define the mold, the combed joint forming plate is located on the inner side of the mold and can be matched with combed joints of a wall body; and 2, the main reinforcements are pre-buried on a lower beam, the main reinforcements are straightened, and stirrups are bound on the main reinforcements. According to the construction method, the constructional column with the combed joints is poured before the wall body is piled, then the wall body is piled on one sides of the combed joints of the constructional column, a hanging basket is not needed, the construction difficulty is reduced, safety is high, constructional column mold is detachable, assembling is easy, the constructional column mold can be repeatedly used, the construction cost is reduced, and the construction method is worthy of application and popularization.
本发明公开了超高层建筑技术领域的一种超高层建筑结构外围临边构造柱施工方法,包括以下施工步骤:步骤一:根据即将需要施工的构造柱设计构造柱模具,该构造柱模具包括马牙槎成型板和辅助侧板,马牙槎成型板和辅助侧板围成模具后,马牙槎成型板位于模具的内侧能够与墙体的马牙槎相配合;步骤二:主筋预埋在下梁上,将主筋顺直,并在主筋上绑扎箍筋,本发明在堆砌墙体之前先浇筑好带有马牙槎的构造柱,然后在构造柱的马牙槎一侧堆砌墙体,无需吊篮的使用,降低了施工的难度,安全性高,构造柱模具可拆卸,组装简单,能够反复使用,降低了施工成本,值得推广使用。
Construction method of peripheral limb constructional column of super high-rise building structure
一种超高层建筑结构外围临边构造柱施工方法
ZHANG CHAO (author) / HAN ZHENGHU (author) / WAN YUNSHUAI (author) / HE LEI (author)
2021-08-10
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Construction method for formwork pouring of super high-rise masonry constructional column
European Patent Office | 2023
|Constructional engineering constructional column structure and wall building method
European Patent Office | 2021
|Constructional column construction method and constructional column mold
European Patent Office | 2021
|European Patent Office | 2023
|