Construction method for combining building of elevator shaft of super high-rise building with steel constructional column
The invention discloses a super high-rise building elevator shaft masonry and steel constructional column combined construction method, and relates to the technical field of super high-rise building elevator shaft construction. Comprising the following steps that S01, a steel column is prefabricated in a factory, and anchor plates are installed at the two ends of the steel column; s02, prefabricated steel columns are transported to a construction site, and the steel columns are vertically installed between frame beams of adjacent floors; s03, ring beam main reinforcements and tie bars are welded to the steel columns; and S04, building construction is conducted between the frame beams provided with the steel columns. A traditional constructional column is replaced with the prefabricated steel column, and a traditional construction method that the wall body is firstly built and then the constructional column is poured through formwork erecting can be changed into a mode that the steel constructional column is firstly installed and then the wall body is built. Construction is convenient, cost is saved, and the construction period is shortened.
本发明公开了一种超高层建筑电梯井道砌筑结合钢构造柱施工方法,涉及超高层电梯井道施工技术领域;包括以下步骤:S01.在工厂预制钢柱,并在钢柱的两端安装锚板;S02.将预制的钢柱运输至施工现场,并将钢柱垂直安装于相邻楼层的框架梁之间;S03.在钢柱上焊接圈梁主筋和拉结筋;S04.在安装有钢柱的框架梁之间砌筑施工。本发明通过预制钢柱替代传统的构造柱,可将传统的先砌筑墙体,再支模浇筑构造柱的施工方法改为先安装钢构造柱,再砌筑墙体的方式。其施工便捷、节约成本且节约工期。
Construction method for combining building of elevator shaft of super high-rise building with steel constructional column
The invention discloses a super high-rise building elevator shaft masonry and steel constructional column combined construction method, and relates to the technical field of super high-rise building elevator shaft construction. Comprising the following steps that S01, a steel column is prefabricated in a factory, and anchor plates are installed at the two ends of the steel column; s02, prefabricated steel columns are transported to a construction site, and the steel columns are vertically installed between frame beams of adjacent floors; s03, ring beam main reinforcements and tie bars are welded to the steel columns; and S04, building construction is conducted between the frame beams provided with the steel columns. A traditional constructional column is replaced with the prefabricated steel column, and a traditional construction method that the wall body is firstly built and then the constructional column is poured through formwork erecting can be changed into a mode that the steel constructional column is firstly installed and then the wall body is built. Construction is convenient, cost is saved, and the construction period is shortened.
本发明公开了一种超高层建筑电梯井道砌筑结合钢构造柱施工方法,涉及超高层电梯井道施工技术领域;包括以下步骤:S01.在工厂预制钢柱,并在钢柱的两端安装锚板;S02.将预制的钢柱运输至施工现场,并将钢柱垂直安装于相邻楼层的框架梁之间;S03.在钢柱上焊接圈梁主筋和拉结筋;S04.在安装有钢柱的框架梁之间砌筑施工。本发明通过预制钢柱替代传统的构造柱,可将传统的先砌筑墙体,再支模浇筑构造柱的施工方法改为先安装钢构造柱,再砌筑墙体的方式。其施工便捷、节约成本且节约工期。
Construction method for combining building of elevator shaft of super high-rise building with steel constructional column
一种超高层建筑电梯井道砌筑结合钢构造柱施工方法
LI XIAOJUN (author) / XIONG DINGZHEN (author) / MA JUNFENG (author) / MA JIANXIN (author) / CAO XIHUA (author) / JUNG BYUNG IL (author) / WANG XIANG (author) / XU KUI (author) / LEI CHANGHUA (author) / NIU BINQIANG (author)
2023-10-13
Patent
Electronic Resource
Chinese
Construction method of peripheral limb constructional column of super high-rise building structure
European Patent Office | 2021
|Super high-rise elevator shaft construction protection assembly
European Patent Office | 2024
|Construction protection system for elevator shaft of high-rise building
European Patent Office | 2022
|Construction method for formwork pouring of super high-rise masonry constructional column
European Patent Office | 2023
|Multi-effect structure of elevator shaft partition wall of super high-rise building
European Patent Office | 2023
|