High-underground-water-level fan foundation construction method
The invention relates to a high-underground-water-level fan foundation construction method. The high-underground-water-level fan foundation construction method comprises the following steps that 1) materials are selected, specifically, according to the characteristics of a site where a project is located and the characteristics of steel sheet piles, the 6m or 9m * 0.4m steel sheet piles are selected; 2) identification is conducted, specifically, a measuring person releases the pile position axis, and lime line identification is scattered; 3) the steel sheet piles are inserted and driven, specifically, the steel sheet piles are hoisted through a pile driver and are centralized in place, and the single piles are continuously inserted and driven one by one; 4) pit digging is conducted, specifically, after the steel sheet piles are inserted and driven, secondary paying-off is conducted, and mechanical pit digging is conducted after secondary paying-off is completed; 5) manual bottom cleaning is conducted, specifically, manual bottom cleaning is conducted on the remaining 20cm pit bottom which is not dug in the step 4); 6) well point dewatering is arranged, specifically, after the pit bottom is dug, annular well point dewatering is arranged at the position 1.0m away from the edge of a foundation pit, and the distance between every two well point dewatering pipes is 1.0m; and 7) after foundation pouring is completed, bearing platform corrosion prevention and grounding construction are conducted. The high-underground-water-level fan foundation construction method has the advantages that effective dewatering is achieved, backward flowing and collapse are prevented, and the construction efficiency is improved.
本发明涉及高地下水位风机基础施工方法,它包括以下步骤:步骤1):选材,根据工程所在场地特点,以及钢板桩的特性,选用6m或9m*0.4m钢板桩;步骤2):标识,由测量人员放出桩位轴线,撒白灰线标识;步骤3):钢板桩插打,打桩机吊起钢板桩,扶正就位,单桩逐根连续插打;步骤4):挖坑,钢板桩插打完,进行二次放线,二次放线完成后进行机械挖坑;步骤5):人工清底,将步骤4)中剩余的20cm未挖的坑底进行人工清底;步骤6):布置井点降水,上述坑底挖成后,在距离基坑边缘1.0m处布置环形井点降水,每根井点降水管间距1.0m;步骤7):基础浇筑完毕后,进行承台防腐和接地施工;本发明具有有效降水、防止倒灌、防止塌方、提高施工效率的优点。
High-underground-water-level fan foundation construction method
The invention relates to a high-underground-water-level fan foundation construction method. The high-underground-water-level fan foundation construction method comprises the following steps that 1) materials are selected, specifically, according to the characteristics of a site where a project is located and the characteristics of steel sheet piles, the 6m or 9m * 0.4m steel sheet piles are selected; 2) identification is conducted, specifically, a measuring person releases the pile position axis, and lime line identification is scattered; 3) the steel sheet piles are inserted and driven, specifically, the steel sheet piles are hoisted through a pile driver and are centralized in place, and the single piles are continuously inserted and driven one by one; 4) pit digging is conducted, specifically, after the steel sheet piles are inserted and driven, secondary paying-off is conducted, and mechanical pit digging is conducted after secondary paying-off is completed; 5) manual bottom cleaning is conducted, specifically, manual bottom cleaning is conducted on the remaining 20cm pit bottom which is not dug in the step 4); 6) well point dewatering is arranged, specifically, after the pit bottom is dug, annular well point dewatering is arranged at the position 1.0m away from the edge of a foundation pit, and the distance between every two well point dewatering pipes is 1.0m; and 7) after foundation pouring is completed, bearing platform corrosion prevention and grounding construction are conducted. The high-underground-water-level fan foundation construction method has the advantages that effective dewatering is achieved, backward flowing and collapse are prevented, and the construction efficiency is improved.
本发明涉及高地下水位风机基础施工方法,它包括以下步骤:步骤1):选材,根据工程所在场地特点,以及钢板桩的特性,选用6m或9m*0.4m钢板桩;步骤2):标识,由测量人员放出桩位轴线,撒白灰线标识;步骤3):钢板桩插打,打桩机吊起钢板桩,扶正就位,单桩逐根连续插打;步骤4):挖坑,钢板桩插打完,进行二次放线,二次放线完成后进行机械挖坑;步骤5):人工清底,将步骤4)中剩余的20cm未挖的坑底进行人工清底;步骤6):布置井点降水,上述坑底挖成后,在距离基坑边缘1.0m处布置环形井点降水,每根井点降水管间距1.0m;步骤7):基础浇筑完毕后,进行承台防腐和接地施工;本发明具有有效降水、防止倒灌、防止塌方、提高施工效率的优点。
High-underground-water-level fan foundation construction method
高地下水位风机基础施工方法
LI ZHOUKE (author) / ZHAO SHUCHUN (author) / YANG PING (author) / FENG XIAODONG (author) / LI HONGXIA (author) / ZHAO DEQING (author) / WEN XINWEI (author) / WANG JIAXING (author) / CHANG FENG (author) / GUO CHANGCHUN (author)
2021-08-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for foundation protection at underground water level
European Patent Office | 2021
|European Patent Office | 2023
|European Patent Office | 2020
|High-water-level foundation pit dewatering construction method
European Patent Office | 2016
|