A platform for research: civil engineering, architecture and urbanism
High-rise building pile foundation construction method
The invention relates to a high-rise building pile foundation construction method. The method involves a connecting disc, an adjusting device and connecting devices, wherein the middle of the connecting disc is connected with the adjusting device in a threaded fit mode, the multiple connecting devices are evenly and circumferentially arranged on the outer side of the adjusting device, and the connecting devices are fixedly connected with the adjusting device. The method can solve the problems that when existing equipment is used for connecting a plurality of reinforcement cages, connection positions are generally bound through steel wire ropes in a manual mode, and the function of rapidly connecting the reinforcement cages cannot be achieved, so that the efficiency of connection between the reinforcement cages is reduced, the working steps of connection between the reinforcement cages are increased, and the construction speed is reduced; and meanwhile, steel bars on the reinforcement cages cannot be clamped and limited, and the reinforcement cages are prone to falling off in the hoisting process, so that the stability of connection between the reinforcement cages is reduced, and the construction safety is reduced.
本发明涉及一种高层建筑桩基施工方法,包括连接盘、调节装置和连接装置,连接盘中部通过螺纹配合的方式连接有调节装置,调节装置外侧均匀周向设置有多个连接装置,连接装置与调节装置固定连接。本发明可以解决现有的设备在针对多个钢筋笼进行连接时,通常采用人工的方式用钢丝绳对连接处进行捆绑,不能实现对钢筋笼之间进行快速连接的功能,从而降低了钢筋笼之间连接的效率,增加了钢筋笼之间连接的工作步骤,降低了施工的速度,同时,不能对钢筋笼上的钢筋进行夹紧限位,钢筋笼在吊装时易出现脱落的现象,并且降低了钢筋笼之间连接的稳定性,从而降低了施工的安全性等问题。
High-rise building pile foundation construction method
The invention relates to a high-rise building pile foundation construction method. The method involves a connecting disc, an adjusting device and connecting devices, wherein the middle of the connecting disc is connected with the adjusting device in a threaded fit mode, the multiple connecting devices are evenly and circumferentially arranged on the outer side of the adjusting device, and the connecting devices are fixedly connected with the adjusting device. The method can solve the problems that when existing equipment is used for connecting a plurality of reinforcement cages, connection positions are generally bound through steel wire ropes in a manual mode, and the function of rapidly connecting the reinforcement cages cannot be achieved, so that the efficiency of connection between the reinforcement cages is reduced, the working steps of connection between the reinforcement cages are increased, and the construction speed is reduced; and meanwhile, steel bars on the reinforcement cages cannot be clamped and limited, and the reinforcement cages are prone to falling off in the hoisting process, so that the stability of connection between the reinforcement cages is reduced, and the construction safety is reduced.
本发明涉及一种高层建筑桩基施工方法,包括连接盘、调节装置和连接装置,连接盘中部通过螺纹配合的方式连接有调节装置,调节装置外侧均匀周向设置有多个连接装置,连接装置与调节装置固定连接。本发明可以解决现有的设备在针对多个钢筋笼进行连接时,通常采用人工的方式用钢丝绳对连接处进行捆绑,不能实现对钢筋笼之间进行快速连接的功能,从而降低了钢筋笼之间连接的效率,增加了钢筋笼之间连接的工作步骤,降低了施工的速度,同时,不能对钢筋笼上的钢筋进行夹紧限位,钢筋笼在吊装时易出现脱落的现象,并且降低了钢筋笼之间连接的稳定性,从而降低了施工的安全性等问题。
High-rise building pile foundation construction method
一种高层建筑桩基施工方法
ZHU XIAOQI (author)
2021-08-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-rise building foundation pile foundation construction method
European Patent Office | 2021
|Reinforcement method for pile foundation construction for high-rise building foundation construction
European Patent Office | 2021
|Composite pile foundation construction method for high-rise building
European Patent Office | 2021
|High-rise building foundation pile foundation setting method
European Patent Office | 2022
|