A platform for research: civil engineering, architecture and urbanism
High-rise building foundation pile foundation setting method
The invention relates to the technical field of buildings, and discloses a high-rise building foundation pile foundation which comprises a mounting building frame arranged on a site, a fixed pile casing is inserted into the mounting building frame, a return spring is arranged in the bottom end of the fixed pile casing, a lower pressing rod is inserted into the fixed pile casing, and the lower pressing rod is fixedly connected with the mounting building frame. An extending block abutting against the lower pressing rod is arranged in the fixed protective cylinder, and a clamping device is arranged outside the top end of the fixed protective cylinder. A protection base part is arranged in the site, the protection base part comprises an embedded cylinder, a reinforcing plate is arranged on one side of the embedded cylinder, and a positioning groove is formed in the side, facing the reinforcing plate, of the embedded cylinder; the clamping device comprises a fixing frame, a clamping rod is inserted outside the fixing frame, and a reset spring is sleeved outside the clamping rod. According to the pile foundation setting method for the high-rise building foundation, the structures of the lower pressing rods and the stretching blocks are simple, implementation is easy, and follow-up maintenance is simple.
本发明涉及建筑技术领域,且公开了一种高层建筑地基桩基,包括设置在场地上的安装搭架,所述安装搭架上插接有固定护筒,所述固定护筒底端的内部装设有回力弹簧,所述固定护筒内插接有下压杆,所述固定护筒内装设有与下压杆相互抵紧的伸展块,所述固定护筒顶端的外部装设有卡接装置;场地内部设置有防护基件,所述防护基件包括预埋筒,所述预埋筒的一侧装设有加强板,所述预埋筒朝向加强板的一侧开设有定位槽;所述卡接装置包括固定框,所述固定框外插接有卡接杆,所述卡接杆外套设有复位弹簧。该高层建筑地基桩基设置方法,通过下压杆与伸展块的结构简单,容易实施,且后续维护也较为简单。
High-rise building foundation pile foundation setting method
The invention relates to the technical field of buildings, and discloses a high-rise building foundation pile foundation which comprises a mounting building frame arranged on a site, a fixed pile casing is inserted into the mounting building frame, a return spring is arranged in the bottom end of the fixed pile casing, a lower pressing rod is inserted into the fixed pile casing, and the lower pressing rod is fixedly connected with the mounting building frame. An extending block abutting against the lower pressing rod is arranged in the fixed protective cylinder, and a clamping device is arranged outside the top end of the fixed protective cylinder. A protection base part is arranged in the site, the protection base part comprises an embedded cylinder, a reinforcing plate is arranged on one side of the embedded cylinder, and a positioning groove is formed in the side, facing the reinforcing plate, of the embedded cylinder; the clamping device comprises a fixing frame, a clamping rod is inserted outside the fixing frame, and a reset spring is sleeved outside the clamping rod. According to the pile foundation setting method for the high-rise building foundation, the structures of the lower pressing rods and the stretching blocks are simple, implementation is easy, and follow-up maintenance is simple.
本发明涉及建筑技术领域,且公开了一种高层建筑地基桩基,包括设置在场地上的安装搭架,所述安装搭架上插接有固定护筒,所述固定护筒底端的内部装设有回力弹簧,所述固定护筒内插接有下压杆,所述固定护筒内装设有与下压杆相互抵紧的伸展块,所述固定护筒顶端的外部装设有卡接装置;场地内部设置有防护基件,所述防护基件包括预埋筒,所述预埋筒的一侧装设有加强板,所述预埋筒朝向加强板的一侧开设有定位槽;所述卡接装置包括固定框,所述固定框外插接有卡接杆,所述卡接杆外套设有复位弹簧。该高层建筑地基桩基设置方法,通过下压杆与伸展块的结构简单,容易实施,且后续维护也较为简单。
High-rise building foundation pile foundation setting method
一种高层建筑地基桩基设置方法
TAN SHENGRONG (author) / GUO PENG (author)
2022-04-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-rise building foundation pile foundation construction method
European Patent Office | 2021
|Reinforcement method for pile foundation construction for high-rise building foundation construction
European Patent Office | 2021
|Slab-pile foundation for a high-rise building
Online Contents | 2008
|