A platform for research: civil engineering, architecture and urbanism
Paving method of granite surface layer of landscape walkway
The invention discloses a paving method of a granite surface layer of a landscape walkway, and relates to the field of municipal landscape engineering construction. The technical scheme is characterized by comprising the following steps that S1 cushion layer construction is conducted, specifically, S101 a formwork is laid; S102 concrete laying is conducted according to the set loose laying thickness, and the concrete is leveled to the elevation of the cushion layer through a special machine; S2 paying off is carried out; S3 paving and pasting are carried out; S301 a bonding layer is laid, and dry cement mortar is laid according to the set thickness of the bonding layer; S302 trial paving is conducted, specifically, granite is paved on the bonding layer, and the granite surface is compacted through a tool till the granite surface is flush with a cross white line; S303 inspection is conducted, the granite is separated from the bonding layer, and gaps are filled with mortar; S304 laying is conducted, specifically, after plain cement paste is laid on the bonding layer, granite is laid, and the granite is compacted through the tool till the granite edge surface is flush with the cross white line; and S4 maintenance is conducted. After step S3 is completed, closed sprinkler maintenance is carried out for 7 to 10 days. The method has the technical effect that the height deviation of the concrete base layer is controlled, so that the laying thickness of the cement mortar layer is similar.
本发明公开了一种景观步行道花岗岩面层的铺砌方法,涉及市政景观工程建设领域,其技术方案要点是包括以下步骤,S1、垫层施工:S101.铺设模板;S102.通过设定的松铺厚度进行混凝土铺设,并通过专用机械整平至垫层标高;S2、放线;S3、铺贴;S301.铺设结合层,通过设定的结合层厚度进行铺设干性水泥砂浆;S302.试铺,将花岗岩铺设在结合层上,通过工具振实至花岗岩表面与十字白线齐平;S303.检验,将花岗岩与结合层分离,通过砂浆填补空隙处;S304.铺设,在结合层上铺素水泥浆后再铺花岗岩,通过工具振实至花岗沿表面与十字白线齐平;S4、养护;步骤S3完成后进行封闭洒水养护7‑10天,技术效果是控制硂基层高度偏差进而使得水泥砂浆层铺设厚度相近。
Paving method of granite surface layer of landscape walkway
The invention discloses a paving method of a granite surface layer of a landscape walkway, and relates to the field of municipal landscape engineering construction. The technical scheme is characterized by comprising the following steps that S1 cushion layer construction is conducted, specifically, S101 a formwork is laid; S102 concrete laying is conducted according to the set loose laying thickness, and the concrete is leveled to the elevation of the cushion layer through a special machine; S2 paying off is carried out; S3 paving and pasting are carried out; S301 a bonding layer is laid, and dry cement mortar is laid according to the set thickness of the bonding layer; S302 trial paving is conducted, specifically, granite is paved on the bonding layer, and the granite surface is compacted through a tool till the granite surface is flush with a cross white line; S303 inspection is conducted, the granite is separated from the bonding layer, and gaps are filled with mortar; S304 laying is conducted, specifically, after plain cement paste is laid on the bonding layer, granite is laid, and the granite is compacted through the tool till the granite edge surface is flush with the cross white line; and S4 maintenance is conducted. After step S3 is completed, closed sprinkler maintenance is carried out for 7 to 10 days. The method has the technical effect that the height deviation of the concrete base layer is controlled, so that the laying thickness of the cement mortar layer is similar.
本发明公开了一种景观步行道花岗岩面层的铺砌方法,涉及市政景观工程建设领域,其技术方案要点是包括以下步骤,S1、垫层施工:S101.铺设模板;S102.通过设定的松铺厚度进行混凝土铺设,并通过专用机械整平至垫层标高;S2、放线;S3、铺贴;S301.铺设结合层,通过设定的结合层厚度进行铺设干性水泥砂浆;S302.试铺,将花岗岩铺设在结合层上,通过工具振实至花岗岩表面与十字白线齐平;S303.检验,将花岗岩与结合层分离,通过砂浆填补空隙处;S304.铺设,在结合层上铺素水泥浆后再铺花岗岩,通过工具振实至花岗沿表面与十字白线齐平;S4、养护;步骤S3完成后进行封闭洒水养护7‑10天,技术效果是控制硂基层高度偏差进而使得水泥砂浆层铺设厚度相近。
Paving method of granite surface layer of landscape walkway
一种景观步行道花岗岩面层的铺砌方法
RUI XINJIE (author) / CHEN ZHICHENG (author) / CHEN JIANCHANG (author)
2021-08-20
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Engineering Index Backfile | 1904
|Engineering Index Backfile | 1896
|