Decorative outer wall construction method
The invention provides a decoration outer wall construction method. The decoration outer wall construction method comprises the following steps that S1, an original cantilever structure base layer is cleaned; S2, the embedding height of a flat steel keel and an eterpan and the embedding width of the eterpan are determined; S3, the distance and the row number of cement nails are determined; S4, the elevation of a pull wire is set; S5, slotting is conducted at the backfill position below the eterpan on the periphery of a main building; S6, the flat steel keel is fixed to the cantilever structure firstly, and then the eterpan is installed and fixed in an auxiliary mode; S7, an anti-cracking material is used for leveling to the original thickness of an outer wall, and the joint position of the eterpan is reinforced by gridding cloth; S8, outer wall decoration materials are sprayed; and S9, the part of the eterpan is backfilled with the lower end penetrating into the soil body. According to the decorative outer wall construction method, and the situation that the decorative outer wall cracks due to soil settlement can be avoided.
本发明提供一种装饰外墙施工方法,包括下述步骤:S1、清理原悬挑结构基层;S2、确定扁钢龙骨与埃特板的下料高度和埃特板的下料宽度;S3、确定水泥钉的间距及排数;S4、拉线设定标高;S5、在主楼周边埃特板下方回填土位置掏槽;S6、先固定所述扁钢龙骨于悬挑结构,再辅助安装固定所述埃特板;S7、采用抗裂材料找平至原外墙厚度,埃特板拼缝位置采用网格布加强;S8、喷涂外墙装饰材料;S9、回填下端深入土体部分埃特板。本发明能够避免装饰外墙因土体沉降而造成开裂的情况。
Decorative outer wall construction method
The invention provides a decoration outer wall construction method. The decoration outer wall construction method comprises the following steps that S1, an original cantilever structure base layer is cleaned; S2, the embedding height of a flat steel keel and an eterpan and the embedding width of the eterpan are determined; S3, the distance and the row number of cement nails are determined; S4, the elevation of a pull wire is set; S5, slotting is conducted at the backfill position below the eterpan on the periphery of a main building; S6, the flat steel keel is fixed to the cantilever structure firstly, and then the eterpan is installed and fixed in an auxiliary mode; S7, an anti-cracking material is used for leveling to the original thickness of an outer wall, and the joint position of the eterpan is reinforced by gridding cloth; S8, outer wall decoration materials are sprayed; and S9, the part of the eterpan is backfilled with the lower end penetrating into the soil body. According to the decorative outer wall construction method, and the situation that the decorative outer wall cracks due to soil settlement can be avoided.
本发明提供一种装饰外墙施工方法,包括下述步骤:S1、清理原悬挑结构基层;S2、确定扁钢龙骨与埃特板的下料高度和埃特板的下料宽度;S3、确定水泥钉的间距及排数;S4、拉线设定标高;S5、在主楼周边埃特板下方回填土位置掏槽;S6、先固定所述扁钢龙骨于悬挑结构,再辅助安装固定所述埃特板;S7、采用抗裂材料找平至原外墙厚度,埃特板拼缝位置采用网格布加强;S8、喷涂外墙装饰材料;S9、回填下端深入土体部分埃特板。本发明能够避免装饰外墙因土体沉降而造成开裂的情况。
Decorative outer wall construction method
一种装饰外墙施工方法
DUAN HONGCHUAN (author) / ZHANG HONGTAO (author) / JIANG WENYONG (author) / MEI JIANGTAO (author)
2021-08-20
Patent
Electronic Resource
Chinese
Decorative outer wall structure and construction method thereof
European Patent Office | 2020
|DECORATIVE OUTER WALL MATERIAL AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2015
|UHPC prefabricated part, decorative outer wall and manufacturing method of decorative outer wall
European Patent Office | 2021
|Construction method of outer wall gradient hollow decorative brick
European Patent Office | 2023
|Construction method of extra-large cavity outer decorative wall
European Patent Office | 2024
|