Reinforcing device for shear wall root formwork and construction method
The invention discloses a reinforcing device for a shear wall root formwork and a construction method. The reinforcing device comprises a pre-embedded assembly, wherein the pre-embedded assembly is transversely erected in the thickness direction of a lower-layer shear wall, part of the pre-embedded assembly is completely pre-embedded in a floor slab layer arranged above the lower-layer shear wall, and the other remaining parts are sequentially buried in the lower-layer shear wall, the floor slab layer and an upper-layer shear wall from bottom to top in the height direction of the lower-layer shear wall; a group of aligned wedge blocks stretch across the pre-embedded assembly in the length direction of the upper-layer shear wall, and the wedge blocks are prefabricated in the floor slab layer along the height portions of the wedge blocks, so that a group of continuous grooves can be formed in the position, close to the wall root of the upper-layer shear wall, of the upper end face of the floor slab layer when the concrete floor slab layer is poured, and a formwork surrounding the upper-layer shear wall can be placed fixedly and conveniently. The reinforcing device is simple in structure, low in manufacturing cost and convenient to use, the wall body strength of the lower-layer shear wall, the floor slab layer and the upper-layer shear wall is improved, meanwhile, the reinforcing force of the formwork at the root of the upper-layer shear wall can be further improved, the labor cost of post-treatment is reduced, and the construction period is shortened.
一种用于剪力墙根部模板加固装置及施工方法,包括:预埋组件,横架于下层剪力墙厚度设置,且部分完全预埋于置于下层剪力墙上方的楼板层中,剩余其它部分沿下层剪力墙高度方向从下到上依次埋置于下层剪力墙、楼板层和上层剪力墙中;在预埋组件上沿上层剪力墙长度方向上横跨一组对位设置的锲块,锲块沿其高度部分预置于楼板层内,以使在浇注混凝土楼板层时使楼板层上端面且靠近上层剪力墙墙根处形成一组连续的凹槽,以便于固定放置围设上层剪力墙的模板。本发明结构简单、制作成本低、使用方便,在提高下层剪力墙、楼板层和上层剪力墙的墙体强度的同时,还可进一步提高上层剪力墙根部模板的加固力,降低了后期处理的人工成本,缩短工期。
Reinforcing device for shear wall root formwork and construction method
The invention discloses a reinforcing device for a shear wall root formwork and a construction method. The reinforcing device comprises a pre-embedded assembly, wherein the pre-embedded assembly is transversely erected in the thickness direction of a lower-layer shear wall, part of the pre-embedded assembly is completely pre-embedded in a floor slab layer arranged above the lower-layer shear wall, and the other remaining parts are sequentially buried in the lower-layer shear wall, the floor slab layer and an upper-layer shear wall from bottom to top in the height direction of the lower-layer shear wall; a group of aligned wedge blocks stretch across the pre-embedded assembly in the length direction of the upper-layer shear wall, and the wedge blocks are prefabricated in the floor slab layer along the height portions of the wedge blocks, so that a group of continuous grooves can be formed in the position, close to the wall root of the upper-layer shear wall, of the upper end face of the floor slab layer when the concrete floor slab layer is poured, and a formwork surrounding the upper-layer shear wall can be placed fixedly and conveniently. The reinforcing device is simple in structure, low in manufacturing cost and convenient to use, the wall body strength of the lower-layer shear wall, the floor slab layer and the upper-layer shear wall is improved, meanwhile, the reinforcing force of the formwork at the root of the upper-layer shear wall can be further improved, the labor cost of post-treatment is reduced, and the construction period is shortened.
一种用于剪力墙根部模板加固装置及施工方法,包括:预埋组件,横架于下层剪力墙厚度设置,且部分完全预埋于置于下层剪力墙上方的楼板层中,剩余其它部分沿下层剪力墙高度方向从下到上依次埋置于下层剪力墙、楼板层和上层剪力墙中;在预埋组件上沿上层剪力墙长度方向上横跨一组对位设置的锲块,锲块沿其高度部分预置于楼板层内,以使在浇注混凝土楼板层时使楼板层上端面且靠近上层剪力墙墙根处形成一组连续的凹槽,以便于固定放置围设上层剪力墙的模板。本发明结构简单、制作成本低、使用方便,在提高下层剪力墙、楼板层和上层剪力墙的墙体强度的同时,还可进一步提高上层剪力墙根部模板的加固力,降低了后期处理的人工成本,缩短工期。
Reinforcing device for shear wall root formwork and construction method
一种用于剪力墙根部模板加固装置及施工方法
MU JIA (author) / ZHANG WEIPENG (author)
2021-08-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Staircase shear wall formwork reinforcing construction method
European Patent Office | 2022
|Shear wall end formwork reinforcing device and reinforcing method
European Patent Office | 2021
|