A platform for research: civil engineering, architecture and urbanism
Construction method of aeolian sand roadbed
The invention discloses a construction method of an aeolian sand roadbed, and relates to the technical field of building construction, and the construction method comprises the following steps: carrying out roadbed filling and carrying out edge covering soil filling on two sides of the roadbed; according to the construction method, when the edge covering soil filling is carried out, widening the width by 0.5-3 m on the basis of the preset edge covering soil filling width, the widened edge covering soil serving as a construction channel for a filling tool or a material conveying tool to advance. By means of the construction method, land outside a construction red line cannot be occupied; the aeolian sand can be transported and unloaded through a construction channel formed by widening the edge covering soil, the phenomenon that a dumper is mistaken due to water loss and sand casting on the surface of the aeolian sand is avoided, the filling construction period of the aeolian sand roadbed is shortened, and the method has the advantages that the filling construction period of the aeolian sand roadbed is shortened, land resources are saved, and the ecological environment is protected; the method has important guiding significance on construction of desert road sections, transitional desert road sections or farmland road sections.
本发明公开了一种风积沙路基的施工方法,涉及建筑施工技术领域,该施工方法包括进行路基填筑以及在路基两侧进行包边土填筑;在进行所述包边土填筑时,在预设包边土填筑宽度的基础上加宽0.5~3m,使加宽后的包边土作为填筑工具或运料工具行进的施工通道,采用本申请提供的施工方法不会占用施工红线外的土地,且风积沙能通过加宽包边土形成的施工通道能够进行拉运以及卸料,避免了因风积沙表面失水翻砂而导致的运料车误车现象,加快了风积沙路基的填筑工期,具有加快风积沙路基的填筑工期、节约土地资源以及保护生态环境等优点,对沙漠路段过渡荒漠路段或农田路段的施工具有重要的指导意义。
Construction method of aeolian sand roadbed
The invention discloses a construction method of an aeolian sand roadbed, and relates to the technical field of building construction, and the construction method comprises the following steps: carrying out roadbed filling and carrying out edge covering soil filling on two sides of the roadbed; according to the construction method, when the edge covering soil filling is carried out, widening the width by 0.5-3 m on the basis of the preset edge covering soil filling width, the widened edge covering soil serving as a construction channel for a filling tool or a material conveying tool to advance. By means of the construction method, land outside a construction red line cannot be occupied; the aeolian sand can be transported and unloaded through a construction channel formed by widening the edge covering soil, the phenomenon that a dumper is mistaken due to water loss and sand casting on the surface of the aeolian sand is avoided, the filling construction period of the aeolian sand roadbed is shortened, and the method has the advantages that the filling construction period of the aeolian sand roadbed is shortened, land resources are saved, and the ecological environment is protected; the method has important guiding significance on construction of desert road sections, transitional desert road sections or farmland road sections.
本发明公开了一种风积沙路基的施工方法,涉及建筑施工技术领域,该施工方法包括进行路基填筑以及在路基两侧进行包边土填筑;在进行所述包边土填筑时,在预设包边土填筑宽度的基础上加宽0.5~3m,使加宽后的包边土作为填筑工具或运料工具行进的施工通道,采用本申请提供的施工方法不会占用施工红线外的土地,且风积沙能通过加宽包边土形成的施工通道能够进行拉运以及卸料,避免了因风积沙表面失水翻砂而导致的运料车误车现象,加快了风积沙路基的填筑工期,具有加快风积沙路基的填筑工期、节约土地资源以及保护生态环境等优点,对沙漠路段过渡荒漠路段或农田路段的施工具有重要的指导意义。
Construction method of aeolian sand roadbed
一种风积沙路基的施工方法
HUANG XIAMING (author) / MA HUI (author) / JIN XIAOPING (author) / HU JING (author) / SUN HONGHAI (author) / LIU JIAQI (author) / CHAI FUQUAN (author) / JIA YANQING (author) / ZHI BAOXIANG (author)
2021-08-31
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Aeolian sand roadbed filling construction device and construction method thereof
European Patent Office | 2024
|Construction method for reinforcing roadbed on aeolian sand through geocell
European Patent Office | 2021
|Auxiliary feeding equipment for aeolian sand roadbed construction and construction method
European Patent Office | 2024
|Construction method of gravel soil interlayer aeolian sand roadbed structure
European Patent Office | 2023
|Aeolian sand roadbed dry-type sandwich structure and construction method
European Patent Office | 2022
|