A platform for research: civil engineering, architecture and urbanism
Construction method of rural sewage treatment equipment
The invention relates to the technical field of sewage treatment, and discloses a construction method of rural sewage treatment equipment. The construction method comprises the following steps: S1, a civil engineering excavation area and a steel concrete foundation are determined according to the number of equipment; S2, a test foundation pit is dug, and steel concrete is built and installed; S3, the equipment is assembled in the foundation pit, and the equipment is filled with water; S4, the foundation pit is subjected to soil covering and landfill, and pipelines and lines are led out; and S5, the pipelines and the lines are correspondingly connected, and construction is completed. According to the construction method, engineering construction soil covering operation is facilitated, meanwhile, limiting and support operation is reduced in engineering implementation, the construction efficiency is improved, and the installation and civil engineering cost is reduced.
本发明涉及污水处理技术领域,公开了一种农村污水处理设备的施工方法,包括步骤:S1、根据设备数量,确定土建开挖面积和钢砼基础;S2、挖设试验基坑,并搭建安装钢砼;S3、在基坑内对设备进行组装,并对设备内灌满水;S4、对基坑进行覆土填埋,并将管路和线路引出;S5、将管路和线路进行对应连接,完成施工。本发明的施工方法便于工程施工覆土操作,同时在工程实施中减少了限位和支架操作,提高了施工效率,降低了安装土建成本。
Construction method of rural sewage treatment equipment
The invention relates to the technical field of sewage treatment, and discloses a construction method of rural sewage treatment equipment. The construction method comprises the following steps: S1, a civil engineering excavation area and a steel concrete foundation are determined according to the number of equipment; S2, a test foundation pit is dug, and steel concrete is built and installed; S3, the equipment is assembled in the foundation pit, and the equipment is filled with water; S4, the foundation pit is subjected to soil covering and landfill, and pipelines and lines are led out; and S5, the pipelines and the lines are correspondingly connected, and construction is completed. According to the construction method, engineering construction soil covering operation is facilitated, meanwhile, limiting and support operation is reduced in engineering implementation, the construction efficiency is improved, and the installation and civil engineering cost is reduced.
本发明涉及污水处理技术领域,公开了一种农村污水处理设备的施工方法,包括步骤:S1、根据设备数量,确定土建开挖面积和钢砼基础;S2、挖设试验基坑,并搭建安装钢砼;S3、在基坑内对设备进行组装,并对设备内灌满水;S4、对基坑进行覆土填埋,并将管路和线路引出;S5、将管路和线路进行对应连接,完成施工。本发明的施工方法便于工程施工覆土操作,同时在工程实施中减少了限位和支架操作,提高了施工效率,降低了安装土建成本。
Construction method of rural sewage treatment equipment
一种农村污水处理设备的施工方法
YANG YONGHONG (author) / WANG ZHIXIONG (author) / ZHAI XIAOYAN (author) / GUO LIRONG (author) / LI HONGGANG (author) / LIAO ZHENHUA (author) / SHI JIANCHUAN (author) / PENG YIXIONG (author) / SU LEI (author) / ZHANG XIAOJIAN (author)
2021-08-31
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD OF SEWAGE TREATMENT EQUIPMENT AND SEWAGE TREATMENT EQUIPMENT BY THIS METHOD
European Patent Office | 2018
CONSTRUCTION METHOD OF SEWAGE TREATMENT EQUIPMENT AND SEWAGE TREATMENT EQUIPMENT BY THIS METHOD
European Patent Office | 2018
|