Construction method of sewage treatment equipment
The invention relates to a construction method of sewage treatment equipment and the sewage treatment equipment. The construction method comprises the following steps: constructing a foundation layer; at least one biochemical treatment barrel is arranged above the base layer, the biochemical treatment barrel comprises a treatment space defined by side walls, and the interior of the treatment space is divided into a plurality of subareas with different treatment effects; and a process platform is built on the periphery of at least one biochemical treatment cylinder. A plurality of biochemical treatment cylinders can be vertically and upwards overlapped on the base layer to fully utilize the space in the vertical direction, and a three-dimensional construction form is adopted, so that the construction land is reduced, and the space utilization rate in a horizontal plane is improved. Meanwhile, the process platform and the biochemical treatment cylinders can be assembled and fixed in a modularized manner, so that the subsequent stacking of the biochemical treatment cylinders and the extension of the process platform are more convenient and quicker, the subsequent construction is more standardized, and the construction efficiency is improved.
本公开涉及一种污水处理设备的建设方法和污水处理设备,包括以下步骤:建设基础层;在基础层上方至少包括一个生化处理筒,其中,生化处理筒包括由侧壁围合形成的处理空间,处理空间内分隔为具有不同处理作用的多个分区;以及在至少一个生化处理筒的外围建设工艺平台。通过在基础层上可以竖直向上叠加多个生化处理筒以充分利用竖直方向上的空间,采用立体式建设形式,缩减建设用地,提高水平面内的空间利用率。同时,工艺平台及生化处理筒均可为模块化拼装固定也方便后续生化处理筒叠加及工艺平台扩建更加便捷快速,使后续搭建更加标准化,提高搭建效率。
Construction method of sewage treatment equipment
The invention relates to a construction method of sewage treatment equipment and the sewage treatment equipment. The construction method comprises the following steps: constructing a foundation layer; at least one biochemical treatment barrel is arranged above the base layer, the biochemical treatment barrel comprises a treatment space defined by side walls, and the interior of the treatment space is divided into a plurality of subareas with different treatment effects; and a process platform is built on the periphery of at least one biochemical treatment cylinder. A plurality of biochemical treatment cylinders can be vertically and upwards overlapped on the base layer to fully utilize the space in the vertical direction, and a three-dimensional construction form is adopted, so that the construction land is reduced, and the space utilization rate in a horizontal plane is improved. Meanwhile, the process platform and the biochemical treatment cylinders can be assembled and fixed in a modularized manner, so that the subsequent stacking of the biochemical treatment cylinders and the extension of the process platform are more convenient and quicker, the subsequent construction is more standardized, and the construction efficiency is improved.
本公开涉及一种污水处理设备的建设方法和污水处理设备,包括以下步骤:建设基础层;在基础层上方至少包括一个生化处理筒,其中,生化处理筒包括由侧壁围合形成的处理空间,处理空间内分隔为具有不同处理作用的多个分区;以及在至少一个生化处理筒的外围建设工艺平台。通过在基础层上可以竖直向上叠加多个生化处理筒以充分利用竖直方向上的空间,采用立体式建设形式,缩减建设用地,提高水平面内的空间利用率。同时,工艺平台及生化处理筒均可为模块化拼装固定也方便后续生化处理筒叠加及工艺平台扩建更加便捷快速,使后续搭建更加标准化,提高搭建效率。
Construction method of sewage treatment equipment
污水处理设备的建设方法
ZHANG NINGDONG (author) / MAO ZHENGKAI (author) / LUAN HAOFENG (author)
2023-04-25
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD OF SEWAGE TREATMENT EQUIPMENT AND SEWAGE TREATMENT EQUIPMENT BY THIS METHOD
European Patent Office | 2018
CONSTRUCTION METHOD OF SEWAGE TREATMENT EQUIPMENT AND SEWAGE TREATMENT EQUIPMENT BY THIS METHOD
European Patent Office | 2018
|Sewage treatment plant grit chamber building construction equipment