The invention provides a floor keel, a sports floor and a construction method. The floor keel comprises frame units and floor units, wherein the floor units are laid on the frame units, the frame units comprise a plurality of main keels and auxiliary keels, the main keels and the auxiliary keels are arranged at intervals, the main keels and the auxiliary keels are vertically and horizontally crossed and are connected with each other, and the main keels and the auxiliary keels are integrally formed. The construction method comprises the following steps of (S1) installing buffer blocks on the frame units; (S2) adjusting the laying flatness of the frame units by setting the height of the buffer blocks; (S3) splicing a plurality of frame units into a piece in the preset position; and (S4) laying the floor units on the frame units, and completing the construction of the sports floor. The sports floor has the advantages of the reasonable structure and convenience in laying, the construction period can be shortened, and the cost is reduced.
本发明提供了一种地板龙骨、运动地板及施工方法,包括框架单元和地板单元,所述地板单元铺设在所述框架单元上,所述框架单元包括多根主龙骨和副龙骨,所述主龙骨和副龙骨分别间隔设置,且所述主龙骨和所述副龙骨纵横交叉并相互形成连接,所述主龙骨和所述副龙骨一体成型;其包括如下步骤:S1、在框架单元上安装缓冲块;S2、设置缓冲块的高度来调整所述框架单元铺设的平整度;S3、在预设位置中将多个所述框架单元在预设位置内拼接成片;S4、在所述框架单元上铺设地板单元并完成运动地板的施工;该运动地板具有结构合理,铺设方便可降低施工周期和成本的优点。
Floor keel, sports floor and construction method
The invention provides a floor keel, a sports floor and a construction method. The floor keel comprises frame units and floor units, wherein the floor units are laid on the frame units, the frame units comprise a plurality of main keels and auxiliary keels, the main keels and the auxiliary keels are arranged at intervals, the main keels and the auxiliary keels are vertically and horizontally crossed and are connected with each other, and the main keels and the auxiliary keels are integrally formed. The construction method comprises the following steps of (S1) installing buffer blocks on the frame units; (S2) adjusting the laying flatness of the frame units by setting the height of the buffer blocks; (S3) splicing a plurality of frame units into a piece in the preset position; and (S4) laying the floor units on the frame units, and completing the construction of the sports floor. The sports floor has the advantages of the reasonable structure and convenience in laying, the construction period can be shortened, and the cost is reduced.
本发明提供了一种地板龙骨、运动地板及施工方法,包括框架单元和地板单元,所述地板单元铺设在所述框架单元上,所述框架单元包括多根主龙骨和副龙骨,所述主龙骨和副龙骨分别间隔设置,且所述主龙骨和所述副龙骨纵横交叉并相互形成连接,所述主龙骨和所述副龙骨一体成型;其包括如下步骤:S1、在框架单元上安装缓冲块;S2、设置缓冲块的高度来调整所述框架单元铺设的平整度;S3、在预设位置中将多个所述框架单元在预设位置内拼接成片;S4、在所述框架单元上铺设地板单元并完成运动地板的施工;该运动地板具有结构合理,铺设方便可降低施工周期和成本的优点。
Floor keel, sports floor and construction method
一种地板龙骨、运动地板及施工方法
SUN CAI (author) / ZHANG JIAGUANG (author)
2021-08-31
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden