A platform for research: civil engineering, architecture and urbanism
Maintenance device for concrete pouring object
The invention discloses a maintenance device for a concrete pouring object. The maintenance device comprises a concrete pouring body, two upper transverse frames, a front water storage tank, a rear water storage tank and guide rods, the concrete pouring body is fixed to the ground, the upper transverse frames are arranged above the concrete pouring body, the two upper transverse frames are correspondingly and symmetrically arranged on the top side edge of the concrete pouring body, and the upper transverse frames extend to the outer side of the concrete pouring body. The front water storage tank and the rear water storage tank are symmetrically arranged on the upper transverse frames, the front water storage tank is arranged close to the front side of the concrete pouring body, the rear water storage tank is arranged close to the rear side of the concrete pouring body, the guide rods are installed on the front water storage tank and the rear water storage tank, and the structure of the front water storage tank is the same as that of the rear water storage tank. The maintenance device for the concrete pouring object is reasonable in design; and by arranging the front water storage tank and the rear water storage tank, the concrete pouring body can be rapidly cured.
本发明公开了一种混凝土浇筑物用养护装置,包括混凝土浇筑体、上横架、前储水箱、后储水箱、导向杆,所述混凝土浇筑体固定在地面上,混凝土浇筑体的上方设有上横架,上横架设有两个,两个上横架分别对称设置在混凝土浇筑体的顶侧边处,且上横架延伸至混凝土浇筑体外侧,上横架上设有前储水箱、后储水箱,前储水箱、后储水箱对称设置,前储水箱靠近混凝土浇筑体的前侧设置,后储水箱靠近混凝土浇筑体的后侧设置,前储水箱、后储水箱上安装有导向杆,前储水箱的结构与后储水箱的结构相同。本发明设计合理;前储水箱、后储水箱的设计能对混凝土浇筑体进行快速养护。
Maintenance device for concrete pouring object
The invention discloses a maintenance device for a concrete pouring object. The maintenance device comprises a concrete pouring body, two upper transverse frames, a front water storage tank, a rear water storage tank and guide rods, the concrete pouring body is fixed to the ground, the upper transverse frames are arranged above the concrete pouring body, the two upper transverse frames are correspondingly and symmetrically arranged on the top side edge of the concrete pouring body, and the upper transverse frames extend to the outer side of the concrete pouring body. The front water storage tank and the rear water storage tank are symmetrically arranged on the upper transverse frames, the front water storage tank is arranged close to the front side of the concrete pouring body, the rear water storage tank is arranged close to the rear side of the concrete pouring body, the guide rods are installed on the front water storage tank and the rear water storage tank, and the structure of the front water storage tank is the same as that of the rear water storage tank. The maintenance device for the concrete pouring object is reasonable in design; and by arranging the front water storage tank and the rear water storage tank, the concrete pouring body can be rapidly cured.
本发明公开了一种混凝土浇筑物用养护装置,包括混凝土浇筑体、上横架、前储水箱、后储水箱、导向杆,所述混凝土浇筑体固定在地面上,混凝土浇筑体的上方设有上横架,上横架设有两个,两个上横架分别对称设置在混凝土浇筑体的顶侧边处,且上横架延伸至混凝土浇筑体外侧,上横架上设有前储水箱、后储水箱,前储水箱、后储水箱对称设置,前储水箱靠近混凝土浇筑体的前侧设置,后储水箱靠近混凝土浇筑体的后侧设置,前储水箱、后储水箱上安装有导向杆,前储水箱的结构与后储水箱的结构相同。本发明设计合理;前储水箱、后储水箱的设计能对混凝土浇筑体进行快速养护。
Maintenance device for concrete pouring object
一种混凝土浇筑物用养护装置
LI KAIFANG (author) / MA YUNSHENG (author) / CHEN CHANGJIANG (author) / MA BO (author) / HAN LEI (author) / LIANG LANFANG (author)
2021-09-03
Patent
Electronic Resource
Chinese
Periodic maintenance device for concrete pouring surface
European Patent Office | 2022
|Rapid watering maintenance device used after concrete pouring
European Patent Office | 2024
|Maintenance device after concrete pouring in building construction
European Patent Office | 2021
|