Building integral translation method
The invention discloses a building integral translation method. The building integral translation method is characterized by at least comprising the following steps: laying a plurality of sliding rails between a temporary placing area and a permanent fixing area, arranging guide pieces at the bottom of a building structure to be moved, arranging guide plates at the edges of the sliding rails, and moving the sliding rails to the permanent fixing area; and when the building structure to be moved slides, the guide pieces are arranged on the sliding rails, and the building structure to be moved is moved to the permanent fixing area from the temporary placing area under the action of external force. By means of the building integral translation method, stable movement and accurate placement of the prefabricated building structure are achieved.
本发明公开了一种建筑整体平移方法,其特征在于,所述建筑整体平移方法至少包括:于临时放置区与永久固定区之间铺设若干滑移轨道,并于待移动建筑结构的底部设置导向件,于滑移轨道边缘处设置导向板,在待移动建筑结构在进行滑移时,所述导向件设置于所述滑移轨道上,并在外力的作用下使得所述带移动建筑结构由临时放置区移动至永久固定区。通过本建筑整体平移方法实现了预制建筑结构的稳定移动和精确放置。
Building integral translation method
The invention discloses a building integral translation method. The building integral translation method is characterized by at least comprising the following steps: laying a plurality of sliding rails between a temporary placing area and a permanent fixing area, arranging guide pieces at the bottom of a building structure to be moved, arranging guide plates at the edges of the sliding rails, and moving the sliding rails to the permanent fixing area; and when the building structure to be moved slides, the guide pieces are arranged on the sliding rails, and the building structure to be moved is moved to the permanent fixing area from the temporary placing area under the action of external force. By means of the building integral translation method, stable movement and accurate placement of the prefabricated building structure are achieved.
本发明公开了一种建筑整体平移方法,其特征在于,所述建筑整体平移方法至少包括:于临时放置区与永久固定区之间铺设若干滑移轨道,并于待移动建筑结构的底部设置导向件,于滑移轨道边缘处设置导向板,在待移动建筑结构在进行滑移时,所述导向件设置于所述滑移轨道上,并在外力的作用下使得所述带移动建筑结构由临时放置区移动至永久固定区。通过本建筑整体平移方法实现了预制建筑结构的稳定移动和精确放置。
Building integral translation method
一种建筑整体平移方法
PENG DEKUN (author) / GAO JIATAO (author) / XU YONG (author) / DONG JIANGFENG (author)
2021-09-03
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,