A platform for research: civil engineering, architecture and urbanism
Side wall block construction method of steel shell pipe joint and steel shell immersed pipe construction method
The invention belongs to the technical field of steel structure construction, and particularly discloses a side wall block construction method of a steel shell pipe joint and a steel shell immersed pipe construction method. The side wall block construction method comprises the steps that a side wall middle assembly, a top plate assembly and a bottom plate assembly are constructed on a plane assembly line in a split mode, and the side wall middle assembly comprises a side wall outer panel lower assembly, a side wall longitudinal partition small assembly and a side wall transverse partition small assembly which are assembled into a whole; the side wall middle assembly, the top plate assembly and the bottom plate assembly are transferred to a block construction workshop; a side wall outer panel is used as a reference, the side wall middle assembly is hoisted to a jig frame, and a side wall inner panel small assembly is assembled to form a side wall assembly; and the top plate assembly and the bottom plate assembly are assembled to the side wall assembly, and a side wall block assembly is formed through welding. According to the side wall block construction method and the steel shell immersed pipe construction method, the construction efficiency of a steel shell immersed pipe can be improved.
本发明属于钢结构建造技术领域,具体公开了一种钢壳管节的边墙块建造方法和钢壳沉管建造方法,包括:在平面流水分段线上分体建造边墙中组件、顶板组件及底板组件,所述边墙中组立包括拼装成一体的边墙外面板下组件、边墙纵隔板小组件及边墙横隔板小组件;将所述边墙中组立、所述顶板组件及所述底板组件转运至块体建造车间;以边墙外面板为基准,将所述边墙中组立吊装至胎架上,并拼装边墙内面板小组件,形成边墙组件;将所述顶板组件及所述底板组件拼装至所述边墙组件,并焊接形成边墙块组件。本发明公开的边墙块建造方法和钢壳沉管建造方法,能够提高钢壳沉管的建造效率。
Side wall block construction method of steel shell pipe joint and steel shell immersed pipe construction method
The invention belongs to the technical field of steel structure construction, and particularly discloses a side wall block construction method of a steel shell pipe joint and a steel shell immersed pipe construction method. The side wall block construction method comprises the steps that a side wall middle assembly, a top plate assembly and a bottom plate assembly are constructed on a plane assembly line in a split mode, and the side wall middle assembly comprises a side wall outer panel lower assembly, a side wall longitudinal partition small assembly and a side wall transverse partition small assembly which are assembled into a whole; the side wall middle assembly, the top plate assembly and the bottom plate assembly are transferred to a block construction workshop; a side wall outer panel is used as a reference, the side wall middle assembly is hoisted to a jig frame, and a side wall inner panel small assembly is assembled to form a side wall assembly; and the top plate assembly and the bottom plate assembly are assembled to the side wall assembly, and a side wall block assembly is formed through welding. According to the side wall block construction method and the steel shell immersed pipe construction method, the construction efficiency of a steel shell immersed pipe can be improved.
本发明属于钢结构建造技术领域,具体公开了一种钢壳管节的边墙块建造方法和钢壳沉管建造方法,包括:在平面流水分段线上分体建造边墙中组件、顶板组件及底板组件,所述边墙中组立包括拼装成一体的边墙外面板下组件、边墙纵隔板小组件及边墙横隔板小组件;将所述边墙中组立、所述顶板组件及所述底板组件转运至块体建造车间;以边墙外面板为基准,将所述边墙中组立吊装至胎架上,并拼装边墙内面板小组件,形成边墙组件;将所述顶板组件及所述底板组件拼装至所述边墙组件,并焊接形成边墙块组件。本发明公开的边墙块建造方法和钢壳沉管建造方法,能够提高钢壳沉管的建造效率。
Side wall block construction method of steel shell pipe joint and steel shell immersed pipe construction method
一种钢壳管节的边墙块建造方法及钢壳沉管建造方法
HE KAIPING (author) / XIA FENGYONG (author) / ZHANG CHANGLIANG (author) / LIANG JIANMING (author) / FENG SHENGKUN (author) / JIANG WEI (author) / LAI SHAOBO (author)
2021-09-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of wall block in immersed tunnel steel shell
European Patent Office | 2020
|Immersed tunnel prefabricated pipe joint end steel shell measuring method
European Patent Office | 2020
|Multilayer pipeline construction platform for steel shell pipe joints of immersed tunnel
European Patent Office | 2023
|Immersed pipe prestressed steel strand cut-off pipe and construction method thereof
European Patent Office | 2023
|Short pipe joint pulling method for immersed pipe butt joint construction
European Patent Office | 2024
|