A platform for research: civil engineering, architecture and urbanism
The invention relates to the field of building construction, in particular to a steel structure fabricated building construction method. According to the steel structure fabricated building construction method, H-shaped steel can be installed in a building. The steel structure fabricated building comprises a two-way push rod and two sliding rods, the middle of the fixed end of the two-way push rod is fixedly connected to a protruding base, the upper end and the lower end of one sliding rod are fixedly connected to the rear sides of two square frames respectively, and the upper end and the lower end of the other sliding rod are fixedly connected to the front sides of the two square frames respectively. According to the steel structure fabricated building construction method, when a H-shaped steel is installed in the building, manual carrying in the building is difficult, certain hidden danger exists in installation, large labor intensity is increased, and certain difficulty exists when the H-shaped steel is aligned, so that the H-shaped steel is convenient to install.
本发明涉及建筑施工领域,更具体的说是一种钢结构装配式建筑施工方法。本发明的目的是提供一种钢机构装配式建筑施工方法,可以在建筑内部进行安装H型钢材。包括双向推杆和滑杆,双向推杆固定端的中部固接在凸座上,滑杆设有两个,一个滑杆的上下两端分别固接在两个方架的后侧固接,另一个滑杆的上下两端分别固接在两个方架的前侧固接。本发明在将H型钢材对建筑内部进行安装时,人工在建筑内存在搬运困难,安装具有一定的危险隐患,增加了较大的劳动强度,而且进行对准H型钢材时还具有一定的难度,所以为便于安装H型钢材。
The invention relates to the field of building construction, in particular to a steel structure fabricated building construction method. According to the steel structure fabricated building construction method, H-shaped steel can be installed in a building. The steel structure fabricated building comprises a two-way push rod and two sliding rods, the middle of the fixed end of the two-way push rod is fixedly connected to a protruding base, the upper end and the lower end of one sliding rod are fixedly connected to the rear sides of two square frames respectively, and the upper end and the lower end of the other sliding rod are fixedly connected to the front sides of the two square frames respectively. According to the steel structure fabricated building construction method, when a H-shaped steel is installed in the building, manual carrying in the building is difficult, certain hidden danger exists in installation, large labor intensity is increased, and certain difficulty exists when the H-shaped steel is aligned, so that the H-shaped steel is convenient to install.
本发明涉及建筑施工领域,更具体的说是一种钢结构装配式建筑施工方法。本发明的目的是提供一种钢机构装配式建筑施工方法,可以在建筑内部进行安装H型钢材。包括双向推杆和滑杆,双向推杆固定端的中部固接在凸座上,滑杆设有两个,一个滑杆的上下两端分别固接在两个方架的后侧固接,另一个滑杆的上下两端分别固接在两个方架的前侧固接。本发明在将H型钢材对建筑内部进行安装时,人工在建筑内存在搬运困难,安装具有一定的危险隐患,增加了较大的劳动强度,而且进行对准H型钢材时还具有一定的难度,所以为便于安装H型钢材。
Steel structure fabricated building construction method
一种钢结构装配式建筑施工方法
LIU MALI (author)
2021-09-07
Patent
Electronic Resource
Chinese
Fabricated building steel structure for building construction
European Patent Office | 2023
|