A platform for research: civil engineering, architecture and urbanism
Fabricated steel structure building construction method
The invention discloses an assembly type steel structure building construction method. Comprising the following steps that prefabricated parts are manufactured and coded respectively, an axis and a foundation elevation are determined, an amplification foot foundation is hoisted, a foundation supporting beam or an outer wall below positive and negative zero is hoisted, a column-beam-wall integrated prefabricated part containing a structural column and a beam-wall integrated prefabricated part without the structural column are assembled in sequence, a floor slab is hoisted, and waterproof rubber strips are inlaid and filled. Provided is a sound-insulation rubber stick. According to the method, the prefabricated parts are coded and classified, the column-beam-wall integrated prefabricated parts containing the structural columns are firstly installed at intervals, and then the beam-wall integrated prefabricated parts without the structural columns are inserted, so that the field workload is greatly reduced, the construction efficiency is high, the period is short, and the whole butt joint installation process is rapid and convenient.
本发明公开了一种装配式钢结构建筑施工方法,包括如下步骤:制备预制构件并分别编码、确定轴线和基础标高、吊装放大脚基础、吊装基础支撑梁或正负零以下外墙、依次按序装配含结构柱的柱梁墙一体化预制部品及不含结构柱的梁墙一体化预制部品、吊装楼板及镶填防水胶条、隔音胶棒。本发明通过对预制构件编码、分类,采取先间隔安装含结构柱的柱梁墙一体化预制部品、再插装不含结构柱的梁墙一体化预制部品的方式,使得现场工作量大大降低,施工效率高、周期短,整个对接安装过程快捷方便。
Fabricated steel structure building construction method
The invention discloses an assembly type steel structure building construction method. Comprising the following steps that prefabricated parts are manufactured and coded respectively, an axis and a foundation elevation are determined, an amplification foot foundation is hoisted, a foundation supporting beam or an outer wall below positive and negative zero is hoisted, a column-beam-wall integrated prefabricated part containing a structural column and a beam-wall integrated prefabricated part without the structural column are assembled in sequence, a floor slab is hoisted, and waterproof rubber strips are inlaid and filled. Provided is a sound-insulation rubber stick. According to the method, the prefabricated parts are coded and classified, the column-beam-wall integrated prefabricated parts containing the structural columns are firstly installed at intervals, and then the beam-wall integrated prefabricated parts without the structural columns are inserted, so that the field workload is greatly reduced, the construction efficiency is high, the period is short, and the whole butt joint installation process is rapid and convenient.
本发明公开了一种装配式钢结构建筑施工方法,包括如下步骤:制备预制构件并分别编码、确定轴线和基础标高、吊装放大脚基础、吊装基础支撑梁或正负零以下外墙、依次按序装配含结构柱的柱梁墙一体化预制部品及不含结构柱的梁墙一体化预制部品、吊装楼板及镶填防水胶条、隔音胶棒。本发明通过对预制构件编码、分类,采取先间隔安装含结构柱的柱梁墙一体化预制部品、再插装不含结构柱的梁墙一体化预制部品的方式,使得现场工作量大大降低,施工效率高、周期短,整个对接安装过程快捷方便。
Fabricated steel structure building construction method
装配式钢结构建筑施工方法
ZHANG ZHAORUI (author) / WANG JUN (author) / YANG HUA (author) / DU GUOCHEN (author) / ZHANG ZHAOMIN (author)
2023-05-05
Patent
Electronic Resource
Chinese
Fabricated building steel structure for building construction
European Patent Office | 2023
|