The invention discloses a municipal concrete pavement slip form construction device which comprises two front bases and two rear bases, the side walls of the front bases and the side walls of the rear bases are rotationally connected with rolling wheels through rotating shafts, the upper ends of the front bases are fixedly connected with a material storage barrel, and a stirring shaft is rotationally connected into the material storage barrel. Stirring blades are fixedly connected to the side wall of the stirring shaft, a baffle is further fixedly connected to the side wall of the stirring shaft, and discharging grooves are formed in the side walls of the front bases. The invention further discloses a construction method of the municipal concrete pavement slip form. The construction method comprises the following steps that S1, selecting raw materials, and designing the mix proportion; s2, preparing a construction site; s3, stirring and transporting the concrete; s4, unloading and distributing materials; s5, performing joint cutting; and S6,performing acceptance and use. A material guide groove is periodically blocked by a baffle, so that the discharging speed of concrete and the walking speed of a paver can be unified, and a concrete pavement with qualified and uniform thickness can be constructed.
本发明公开了一种市政混凝土路面滑模施工装置,包括两个前基座与两个后基座,所述前基座与后基座的侧壁均通过转轴转动连接有滚轮,所述前基座的上端固定连接有储料筒,所述储料筒内转动连接有搅拌轴,所述搅拌轴的侧壁固定连接有搅拌叶片,所述搅拌轴的侧壁还固定连接有挡板,所述前基座的侧壁开设有排料槽。本发明还公开了一种市政混凝土路面滑模的施工方法,包括以下步骤:S1、选取原材料及设计配合比;S2、准备施工现场;S3、搅拌及运输混凝土;S4、卸料、布料;S5、切缝;S6、验收使用。本发明通过使挡板将周期性的挡住导料槽,如此可使混凝土的排出速度与摊铺机行走速度统一,从而施工出厚度合格且均匀的混凝土路面。
The invention discloses a municipal concrete pavement slip form construction device which comprises two front bases and two rear bases, the side walls of the front bases and the side walls of the rear bases are rotationally connected with rolling wheels through rotating shafts, the upper ends of the front bases are fixedly connected with a material storage barrel, and a stirring shaft is rotationally connected into the material storage barrel. Stirring blades are fixedly connected to the side wall of the stirring shaft, a baffle is further fixedly connected to the side wall of the stirring shaft, and discharging grooves are formed in the side walls of the front bases. The invention further discloses a construction method of the municipal concrete pavement slip form. The construction method comprises the following steps that S1, selecting raw materials, and designing the mix proportion; s2, preparing a construction site; s3, stirring and transporting the concrete; s4, unloading and distributing materials; s5, performing joint cutting; and S6,performing acceptance and use. A material guide groove is periodically blocked by a baffle, so that the discharging speed of concrete and the walking speed of a paver can be unified, and a concrete pavement with qualified and uniform thickness can be constructed.
本发明公开了一种市政混凝土路面滑模施工装置,包括两个前基座与两个后基座,所述前基座与后基座的侧壁均通过转轴转动连接有滚轮,所述前基座的上端固定连接有储料筒,所述储料筒内转动连接有搅拌轴,所述搅拌轴的侧壁固定连接有搅拌叶片,所述搅拌轴的侧壁还固定连接有挡板,所述前基座的侧壁开设有排料槽。本发明还公开了一种市政混凝土路面滑模的施工方法,包括以下步骤:S1、选取原材料及设计配合比;S2、准备施工现场;S3、搅拌及运输混凝土;S4、卸料、布料;S5、切缝;S6、验收使用。本发明通过使挡板将周期性的挡住导料槽,如此可使混凝土的排出速度与摊铺机行走速度统一,从而施工出厚度合格且均匀的混凝土路面。
Municipal concrete pavement slip form construction device and construction method
一种市政混凝土路面滑模施工装置及施工方法
YE DELAI (author)
2021-09-10
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Municipal pavement pervious concrete construction method
European Patent Office | 2021
|Construction procedures of slip-form pavement
Engineering Index Backfile | 1961
|