A platform for research: civil engineering, architecture and urbanism
Fabricated structure and construction method thereof
The invention relates to the technical field of building construction, in particular to a fabricated structure and a construction method thereof. The fabricated structure is installed in a foundation pit groove in a soil layer, the upper surface of the soil layer is fixedly connected with a floor, the floor is provided with an installation hole corresponding to the foundation pit groove, the fabricated structure comprises a prefabricated well body with the top end provided with a working groove, and the prefabricated well body penetrates through the installation hole and is connected into the foundation pit groove in an inserted mode; the bottom end of the groove wall of the working groove is connected with a tying component used for being fixedly connected with an engineering pile, the bottom end of the prefabricated well body is provided with an avoiding hole allowing the engineering pile to penetrate through; a waterproof connecting layer is connected between the groove wall of the foundation pit groove and the outer side wall of the prefabricated well body. The fabricated structure and the construction method thereof have the effect of being convenient to construct.
本申请涉及建筑施工的技术领域,尤其是涉及一种装配式结构及其施工方法。其中,一种装配式结构安装于土层上的基坑槽,土层的上表面固定连接有地板,所述地板对应基坑槽开设有安装孔,装配式结构包括顶端开设有工作槽的预制井体,所述预制井体穿过安装孔并且插接连接于基坑槽内,所述工作槽的槽壁底端连接有用于与工程桩固定连接的拉结部件;所述预制井体的底端开设有供工程桩穿设的避让孔;所述基坑槽的槽壁与预制井体的外侧壁之间连接有防水连接层。本申请具有便于施工的效果。
Fabricated structure and construction method thereof
The invention relates to the technical field of building construction, in particular to a fabricated structure and a construction method thereof. The fabricated structure is installed in a foundation pit groove in a soil layer, the upper surface of the soil layer is fixedly connected with a floor, the floor is provided with an installation hole corresponding to the foundation pit groove, the fabricated structure comprises a prefabricated well body with the top end provided with a working groove, and the prefabricated well body penetrates through the installation hole and is connected into the foundation pit groove in an inserted mode; the bottom end of the groove wall of the working groove is connected with a tying component used for being fixedly connected with an engineering pile, the bottom end of the prefabricated well body is provided with an avoiding hole allowing the engineering pile to penetrate through; a waterproof connecting layer is connected between the groove wall of the foundation pit groove and the outer side wall of the prefabricated well body. The fabricated structure and the construction method thereof have the effect of being convenient to construct.
本申请涉及建筑施工的技术领域,尤其是涉及一种装配式结构及其施工方法。其中,一种装配式结构安装于土层上的基坑槽,土层的上表面固定连接有地板,所述地板对应基坑槽开设有安装孔,装配式结构包括顶端开设有工作槽的预制井体,所述预制井体穿过安装孔并且插接连接于基坑槽内,所述工作槽的槽壁底端连接有用于与工程桩固定连接的拉结部件;所述预制井体的底端开设有供工程桩穿设的避让孔;所述基坑槽的槽壁与预制井体的外侧壁之间连接有防水连接层。本申请具有便于施工的效果。
Fabricated structure and construction method thereof
一种装配式结构及其施工方法
CHEN XIN (author) / LUO DEWEN (author) / LU JINYANG (author)
2021-09-10
Patent
Electronic Resource
Chinese
Fabricated building structure and construction method thereof
European Patent Office | 2024
|Fabricated building structure and construction method thereof
European Patent Office | 2023
|Fabricated canopy construction method and structure thereof
European Patent Office | 2022
|Fabricated plant structure and construction method thereof
European Patent Office | 2024
|Fabricated platform structure and construction method thereof
European Patent Office | 2023
|