Construction method for sealing settlement post-cast strip in advance
The invention discloses a construction method for sealing a settlement post-cast strip in advance. The construction method comprises the following steps that S1, after top plates on the two sides of the settlement post-cast strip are constructed, water retaining ridges are symmetrically poured at the positions, 130-180 mm away from a construction joint, of the two sides of the post-cast strip, and grooves and tongues are formed in the water retaining ridges to serve as supports for containing post-cast strip prefabricated cover plates; S2, after the water retaining ridges are maintained for 7 days, the prefabricated cover plates prefabricated in advance are sequentially placed on the grooves and tongues of the water retaining ridges, and the prefabricated cover plates cover the settlement post-cast strip; S3, gaps between the prefabricated cover plates and gaps between the water retaining ridges and the prefabricated cover plates are tightly blocked through sealing factice; S4, DN125 steel sleeves are arranged on the paved row of prefabricated cover plates every 6-8m, and one end of each steel sleeve penetrates through the corresponding prefabricated cover plate; and S5, the prefabricated cover plates, the water retaining ridges and waterproof layers and protective layers on the steel sleeves are constructed according to a garage top plate waterproof method, and then normal backfilling can be conducted. According to the construction method, the measures for sealing the post-cast strip in advance are achieved, engineering construction such as top plate backfilling and outdoor pipe networks can be conducted in advance, and the construction period is shortened.
本发明公开了一种沉降后浇带提前封闭施工方法,步骤如下:S1.沉降后浇带两侧顶板施工完成后,在后浇带两侧距施工缝130~180mm处对称浇筑挡水坎,挡水坎上设企口,作为后浇带预制盖板搁置的支座;S2.挡水坎养护7天后,将提前预制好的预制盖板依序放置在挡水坎的企口上,使预制盖板盖住沉降后浇带;S3.预制盖板之间的缝隙以及挡水坎与预制盖板之间的缝隙用密封油膏封堵严密;S4.在铺好的一排预制盖板上,每隔6~8m设置一根DN125的钢套管,钢套管的一端穿过预制盖板;S5.按车库顶板防水做法施工完预制盖板、挡水坎以及钢套管上的防水层和保护层即可正常回填土。本发明实现后浇带的提前封闭措施,可提前进行顶板回填土和室外管网等工程施工,缩短施工工期。
Construction method for sealing settlement post-cast strip in advance
The invention discloses a construction method for sealing a settlement post-cast strip in advance. The construction method comprises the following steps that S1, after top plates on the two sides of the settlement post-cast strip are constructed, water retaining ridges are symmetrically poured at the positions, 130-180 mm away from a construction joint, of the two sides of the post-cast strip, and grooves and tongues are formed in the water retaining ridges to serve as supports for containing post-cast strip prefabricated cover plates; S2, after the water retaining ridges are maintained for 7 days, the prefabricated cover plates prefabricated in advance are sequentially placed on the grooves and tongues of the water retaining ridges, and the prefabricated cover plates cover the settlement post-cast strip; S3, gaps between the prefabricated cover plates and gaps between the water retaining ridges and the prefabricated cover plates are tightly blocked through sealing factice; S4, DN125 steel sleeves are arranged on the paved row of prefabricated cover plates every 6-8m, and one end of each steel sleeve penetrates through the corresponding prefabricated cover plate; and S5, the prefabricated cover plates, the water retaining ridges and waterproof layers and protective layers on the steel sleeves are constructed according to a garage top plate waterproof method, and then normal backfilling can be conducted. According to the construction method, the measures for sealing the post-cast strip in advance are achieved, engineering construction such as top plate backfilling and outdoor pipe networks can be conducted in advance, and the construction period is shortened.
本发明公开了一种沉降后浇带提前封闭施工方法,步骤如下:S1.沉降后浇带两侧顶板施工完成后,在后浇带两侧距施工缝130~180mm处对称浇筑挡水坎,挡水坎上设企口,作为后浇带预制盖板搁置的支座;S2.挡水坎养护7天后,将提前预制好的预制盖板依序放置在挡水坎的企口上,使预制盖板盖住沉降后浇带;S3.预制盖板之间的缝隙以及挡水坎与预制盖板之间的缝隙用密封油膏封堵严密;S4.在铺好的一排预制盖板上,每隔6~8m设置一根DN125的钢套管,钢套管的一端穿过预制盖板;S5.按车库顶板防水做法施工完预制盖板、挡水坎以及钢套管上的防水层和保护层即可正常回填土。本发明实现后浇带的提前封闭措施,可提前进行顶板回填土和室外管网等工程施工,缩短施工工期。
Construction method for sealing settlement post-cast strip in advance
一种沉降后浇带提前封闭施工方法
XU YANGWEI (author) / HUANG YONGHUA (author) / CHANG MINGLIANG (author) / ZHOU TONGMING (author) / ZHANG GUOYANG (author)
2021-09-10
Patent
Electronic Resource
Chinese
Structure for sealing settlement post-cast strip in advance
European Patent Office | 2021
|Construction method for sealing post-cast strip in advance
European Patent Office | 2022
|Method for sealing settlement post-cast strip of underground garage in advance
European Patent Office | 2021
|European Patent Office | 2023
|Pre-sealing construction method for basement roof settlement post-cast strip
European Patent Office | 2022
|