A platform for research: civil engineering, architecture and urbanism
Municipal rain and sewage prefabricated well chamber and well chamber pipe orifice plugging construction method
The invention discloses a municipal rainwater and sewage prefabricated well chamber and a well chamber pipe orifice plugging construction method. The well chamber and a pipeline are connected through the well chamber pipe orifice plugging construction method, a pipe orifice of the pipeline of the well chamber and the pipeline can form a pipe orifice encapsulating system suitable for the municipal well chamber, the pipe orifice encapsulating system can ensure that potential quality hazards of water leakage and water seepage do not occur any more after soil is backfilled, and the problem that drift sand enters the well chamber in the later period, and therefore the upper ground sinks and the use function is not facilitated can be solved. Compared with a traditional construction method, the well chamber pipe orifice plugging construction method is simple in process, high in operability and small in construction difficulty, and the leakage risk in the later use process is greatly reduced.
本发明公开了一种市政雨、污水预制的井室及井室管口封堵施工方法,通过本方法进行井室与管道的连接,能够使井室的管道管口与管道形成适用于市政井室的管口包封体系,此体系能保证在回填土之后不再发生漏水及渗水的质量隐患,并能保证在后期不会有流沙进入井室,造成上部地面沉陷能不利于使用功能的问题发生;与传统施工方法相比,工序简单、可操作性强、施工难度小,且后期使用过程中渗漏风险大大减少。
Municipal rain and sewage prefabricated well chamber and well chamber pipe orifice plugging construction method
The invention discloses a municipal rainwater and sewage prefabricated well chamber and a well chamber pipe orifice plugging construction method. The well chamber and a pipeline are connected through the well chamber pipe orifice plugging construction method, a pipe orifice of the pipeline of the well chamber and the pipeline can form a pipe orifice encapsulating system suitable for the municipal well chamber, the pipe orifice encapsulating system can ensure that potential quality hazards of water leakage and water seepage do not occur any more after soil is backfilled, and the problem that drift sand enters the well chamber in the later period, and therefore the upper ground sinks and the use function is not facilitated can be solved. Compared with a traditional construction method, the well chamber pipe orifice plugging construction method is simple in process, high in operability and small in construction difficulty, and the leakage risk in the later use process is greatly reduced.
本发明公开了一种市政雨、污水预制的井室及井室管口封堵施工方法,通过本方法进行井室与管道的连接,能够使井室的管道管口与管道形成适用于市政井室的管口包封体系,此体系能保证在回填土之后不再发生漏水及渗水的质量隐患,并能保证在后期不会有流沙进入井室,造成上部地面沉陷能不利于使用功能的问题发生;与传统施工方法相比,工序简单、可操作性强、施工难度小,且后期使用过程中渗漏风险大大减少。
Municipal rain and sewage prefabricated well chamber and well chamber pipe orifice plugging construction method
一种市政雨、污水预制的井室及井室管口封堵施工方法
LIU TONGYING (author) / MA YIFANG (author) / MA FUJIAN (author) / HU BIN (author) / YU DENGHE (author) / LU YE (author) / XU CHANGGENG (author) / ZHENG QIYUAN (author) / LI TONG (author) / GAO REN (author)
2021-09-28
Patent
Electronic Resource
Chinese
Plugging method and equipment for rain and sewage leakage well chamber
European Patent Office | 2023
|Rain sewage pipeline well chamber desilting device and method
European Patent Office | 2024
|Prefabricated well chamber structure and construction method thereof
European Patent Office | 2023
|Construction method for prefabricated underground well chamber of underground pipe network system
European Patent Office | 2023
|European Patent Office | 2021
|