Construction method for prefabricated underground well chamber of underground pipe network system
The invention provides a construction method for prefabricating an underground well chamber of an underground pipe network system. The construction method comprises the following steps that firstly, the position of the underground well chamber is determined according to planning of the underground pipe network system; 2, calculating the weight of concrete required by the underground well chamber, and selecting a lifting hook according to the weight of the underground well chamber; thirdly, the underground well chamber is prefabricated; fourthly, the underground well chamber upper vehicle is hoisted; and fifthly, the underground well chamber is hoisted into the foundation pit. On the premise of conditions, the underground well chambers are prefabricated in batches, and the construction period is shortened.
本发明提供了一种地下管网系统预制地下井室的施工方法,包括以下步骤:步骤一,根据地下管网系统规划确认地下井室位置;步骤二,计算所述地下井室所需混凝土重量,结合所述地下井室重量选择吊钩;步骤三,预制所述地下井室;步骤四,吊装所述地下井室上车;步骤五,吊运所述地下井室进入基坑。本发明在有条件的前提下,将地下井室进行批量预制,节省工期。
Construction method for prefabricated underground well chamber of underground pipe network system
The invention provides a construction method for prefabricating an underground well chamber of an underground pipe network system. The construction method comprises the following steps that firstly, the position of the underground well chamber is determined according to planning of the underground pipe network system; 2, calculating the weight of concrete required by the underground well chamber, and selecting a lifting hook according to the weight of the underground well chamber; thirdly, the underground well chamber is prefabricated; fourthly, the underground well chamber upper vehicle is hoisted; and fifthly, the underground well chamber is hoisted into the foundation pit. On the premise of conditions, the underground well chambers are prefabricated in batches, and the construction period is shortened.
本发明提供了一种地下管网系统预制地下井室的施工方法,包括以下步骤:步骤一,根据地下管网系统规划确认地下井室位置;步骤二,计算所述地下井室所需混凝土重量,结合所述地下井室重量选择吊钩;步骤三,预制所述地下井室;步骤四,吊装所述地下井室上车;步骤五,吊运所述地下井室进入基坑。本发明在有条件的前提下,将地下井室进行批量预制,节省工期。
Construction method for prefabricated underground well chamber of underground pipe network system
一种地下管网系统预制地下井室的施工方法
LI WENBO (author) / JIANG SHUANGYIN (author) / ZHANG CHI (author) / LI GUODONG (author) / LI MING (author) / WU SHIMING (author) / LI XINJIAN (author) / HUANG ZHERUI (author) / BAI ZIXUAN (author) / LIU YAN (author)
2023-08-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated underground comprehensive pipe rack and construction method
European Patent Office | 2020
|Prefabricated former for constructing underground chamber
European Patent Office | 2021
|Prefabricated former for constructing underground chamber
European Patent Office | 2019
|PREFABRICATED FORMER FOR CONSTRUCTING UNDERGROUND CHAMBER
European Patent Office | 2024
|Comprehensive waterproof construction method for underground prefabricated pipe gallery
European Patent Office | 2022
|