Capping platform loading and unloading method
The invention belongs to the technical field of capping beam platform disassembly, and discloses a capping beam platform loading and unloading method which comprises the following steps: firstly, mounting a main bearing beam on a bridge pier, and building a capping beam platform on the main bearing beam to complete the pouring operation of a capping beam; after construction of the bent cap is completed, a positioning frame is installed above the bent cap, a cross arm is arranged below the main bearing beam, and the cross arm is hung to the bottom of the main bearing beam; secondly, connecting components between the main bearing beams and the bridge piers are disassembled; and finally, the cross arm is lowered, and the bent cap platform is lowered to the ground along with the cross arm. According to the capping beam platform assembling and disassembling method, high-altitude disassembling operation of the capping beam platform is converted into ground disassembling operation, the operation safety of constructors is guaranteed, the construction efficiency is improved, the safety risk of disassembling of the capping beam platform is greatly reduced, and the construction cost is saved.
本发明属于盖梁平台拆卸技术领域,公开了一种盖梁平台装卸方法,首先在桥墩上安装主承重梁,并在主承重梁上搭建盖梁平台,完成盖梁的浇筑作业;待盖梁施工完成后,在盖梁上方安装定位架,在主承重梁下方设置横担,并将横担吊挂至主承重梁梁底;其次,拆卸主承重梁与桥墩间的连接构件;最后,下放横担,盖梁平台随横担下放至地面。本发明的盖梁平台装卸方法将盖梁平台高空拆除作业转变为地面拆卸作业,保证了施工人员作业安全,提高了施工效率,大大降低了盖梁平台拆卸的安全风险,节约施工成本。
Capping platform loading and unloading method
The invention belongs to the technical field of capping beam platform disassembly, and discloses a capping beam platform loading and unloading method which comprises the following steps: firstly, mounting a main bearing beam on a bridge pier, and building a capping beam platform on the main bearing beam to complete the pouring operation of a capping beam; after construction of the bent cap is completed, a positioning frame is installed above the bent cap, a cross arm is arranged below the main bearing beam, and the cross arm is hung to the bottom of the main bearing beam; secondly, connecting components between the main bearing beams and the bridge piers are disassembled; and finally, the cross arm is lowered, and the bent cap platform is lowered to the ground along with the cross arm. According to the capping beam platform assembling and disassembling method, high-altitude disassembling operation of the capping beam platform is converted into ground disassembling operation, the operation safety of constructors is guaranteed, the construction efficiency is improved, the safety risk of disassembling of the capping beam platform is greatly reduced, and the construction cost is saved.
本发明属于盖梁平台拆卸技术领域,公开了一种盖梁平台装卸方法,首先在桥墩上安装主承重梁,并在主承重梁上搭建盖梁平台,完成盖梁的浇筑作业;待盖梁施工完成后,在盖梁上方安装定位架,在主承重梁下方设置横担,并将横担吊挂至主承重梁梁底;其次,拆卸主承重梁与桥墩间的连接构件;最后,下放横担,盖梁平台随横担下放至地面。本发明的盖梁平台装卸方法将盖梁平台高空拆除作业转变为地面拆卸作业,保证了施工人员作业安全,提高了施工效率,大大降低了盖梁平台拆卸的安全风险,节约施工成本。
Capping platform loading and unloading method
一种盖梁平台装卸方法
LI PAN (author) / YU YONGWANG (author) / CHENG WEI (author) / TONG WEIJUN (author) / DENG FUCHAO (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
ADAPTABLE PLATFORM FOR LOADING AND UNLOADING RAILWAY CARS
European Patent Office | 2017
|Adaptable platform for loading and unloading railway cars
European Patent Office | 2017
|LOADING/UNLOADING PASSAGE OPENING/CLOSING DEVICE FOR PLATFORM
European Patent Office | 2016
|