A platform for research: civil engineering, architecture and urbanism
Industrial factory building step type independent foundation formwork reinforcing method
The invention provides an industrial factory building step type independent foundation formwork reinforcing method. The industrial factory building step type independent foundation formwork reinforcing method comprises the following steps that a plurality of pre-buried fixing pieces are pre-buried on an independent foundation cushion layer; first vertical steel pipes are fixed to the corners of a first-layer step independent foundation formwork, first vertical steel pipes are connected with the pre-buried fixing pieces through first connecting pieces, and transverse steel pipes are installed on the periphery of the first-layer step independent foundation formwork; the first vertical steel pipes are buckled with inclined steel pipes, and the end parts of the inclined steel pipes are supported through supporting pieces; second vertical steel pipes are fixedly installed at all corners of the independent foundation formworks of the steps on the second layer or above; and the second vertical steel pipes and the inclined steel pipes are locked through movable fasteners. According to the industrial factory building step type independent foundation formwork reinforcing method, the pre-buried fixing pieces serve as supporting points for reinforcing the novel formwork, the bearing capacity of the first-layer step foundation formwork is improved, a traditional batten supporting system is replaced with the steel pipes, the first-layer formwork is stably fixed through the steel pipes and the pre-buried fixing pieces, and conditions are provided for one-time formwork hanging of the second-layer or above step foundation formwork.
本发明提供了一种工业厂房台阶式独立基础模板加固方法,该方法包括:在独立基础垫层上预埋若干个预埋固定件;在一层台阶独立基础模板的边角固定第一竖向钢管,并通过第一连接件将第一竖向钢管与预埋固定件连接,并在一层台阶独立基础模板的外周安装横向钢管;将第一竖向钢管扣接斜向钢管,通过支撑件对斜向钢管端部支撑;在二层及以上台阶独立基础模板的各个边角处固定安装第二竖向钢管;通过活动扣件将第二竖向钢管与斜向钢管锁死。本发明通过预埋固定件充当了新型模板加固的支点,提高一层台阶基础模板的承载能力,用钢管代替了传统的木方支撑体系,与预埋的预埋固定件将一层的模板稳定地固定,为二层及以上台阶基础模板一次吊模提供了条件。
Industrial factory building step type independent foundation formwork reinforcing method
The invention provides an industrial factory building step type independent foundation formwork reinforcing method. The industrial factory building step type independent foundation formwork reinforcing method comprises the following steps that a plurality of pre-buried fixing pieces are pre-buried on an independent foundation cushion layer; first vertical steel pipes are fixed to the corners of a first-layer step independent foundation formwork, first vertical steel pipes are connected with the pre-buried fixing pieces through first connecting pieces, and transverse steel pipes are installed on the periphery of the first-layer step independent foundation formwork; the first vertical steel pipes are buckled with inclined steel pipes, and the end parts of the inclined steel pipes are supported through supporting pieces; second vertical steel pipes are fixedly installed at all corners of the independent foundation formworks of the steps on the second layer or above; and the second vertical steel pipes and the inclined steel pipes are locked through movable fasteners. According to the industrial factory building step type independent foundation formwork reinforcing method, the pre-buried fixing pieces serve as supporting points for reinforcing the novel formwork, the bearing capacity of the first-layer step foundation formwork is improved, a traditional batten supporting system is replaced with the steel pipes, the first-layer formwork is stably fixed through the steel pipes and the pre-buried fixing pieces, and conditions are provided for one-time formwork hanging of the second-layer or above step foundation formwork.
本发明提供了一种工业厂房台阶式独立基础模板加固方法,该方法包括:在独立基础垫层上预埋若干个预埋固定件;在一层台阶独立基础模板的边角固定第一竖向钢管,并通过第一连接件将第一竖向钢管与预埋固定件连接,并在一层台阶独立基础模板的外周安装横向钢管;将第一竖向钢管扣接斜向钢管,通过支撑件对斜向钢管端部支撑;在二层及以上台阶独立基础模板的各个边角处固定安装第二竖向钢管;通过活动扣件将第二竖向钢管与斜向钢管锁死。本发明通过预埋固定件充当了新型模板加固的支点,提高一层台阶基础模板的承载能力,用钢管代替了传统的木方支撑体系,与预埋的预埋固定件将一层的模板稳定地固定,为二层及以上台阶基础模板一次吊模提供了条件。
Industrial factory building step type independent foundation formwork reinforcing method
一种工业厂房台阶式独立基础模板加固方法
ZHU SHUCHENG (author) / CHEN QICHAO (author) / PAN KE (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of cast-in-place multi-step independent foundation formwork reinforcing device
European Patent Office | 2024
|European Patent Office | 2023
|Independent foundation column formwork reinforcing device and construction method
European Patent Office | 2024
|European Patent Office | 2024
|