Traction type pipe gallery mounting method
The invention provides a traction type pipe gallery mounting method. The traction type pipe gallery mounting method comprises the following steps of S1, digging a foundation pit, paving gallery lifting rails on the two sides of a starting section of the foundation pit, and paving a traction rail in the foundation pit along the length direction of the foundation pit; S2, mounting gallery lifting machines on the gallery lifting rails, and mounting a traction machine at the end, away from the gallery lifting rails, of the traction rail; S3, lifting a pipe gallery through the gallery lifting machines, and hoisting the pipe gallery to a gallery falling position of the traction rail; S4, connecting the traction machine with the traction point of the pipe gallery, and pulling the pipe gallery to a mounting position; and S5, injecting cement mortar into the bottom side of the pipe gallery through grouting holes of the pipe gallery, and complete installation. According to the traction type pipe gallery mounting method, the pipe gallery is pulled to the mounting position through the traction machine, the labor intensity of workers is reduced, the mounting efficiency is improved, meanwhile, the mounting precision of the pipe gallery is guaranteed through traction alignment of the traction machine on the pipe gallery, and the mounting quality is improved.
本发明提供一种牵引式管廊安装方法,包括如下步骤:S1,挖设基坑,并在所述基坑的始发段的两侧铺设提廊轨道,在所述基坑内沿所述基坑的长度方向铺设牵引轨道;S2,将提廊机安装于所述提廊轨道上,将牵引机安装于所述牵引轨道远离所述提廊轨道的一端;S3,通过所述提廊机对管廊进行提廊,并吊放至所述牵引轨道的落廊位置;S4,通过所述牵引机与所述管廊的牵引点连接,并将所述管廊牵引至安装位置;S5,通过所述管廊的注浆孔向所述管廊的底侧注入水泥砂浆,完成安装。本发明实现通过牵引机将管廊牵引至安装位置,降低工作人员的劳动强度,提高安装效率,同时,通过牵引机对管廊的牵引对位,保证管廊的安装精度,提高安装质量。
Traction type pipe gallery mounting method
The invention provides a traction type pipe gallery mounting method. The traction type pipe gallery mounting method comprises the following steps of S1, digging a foundation pit, paving gallery lifting rails on the two sides of a starting section of the foundation pit, and paving a traction rail in the foundation pit along the length direction of the foundation pit; S2, mounting gallery lifting machines on the gallery lifting rails, and mounting a traction machine at the end, away from the gallery lifting rails, of the traction rail; S3, lifting a pipe gallery through the gallery lifting machines, and hoisting the pipe gallery to a gallery falling position of the traction rail; S4, connecting the traction machine with the traction point of the pipe gallery, and pulling the pipe gallery to a mounting position; and S5, injecting cement mortar into the bottom side of the pipe gallery through grouting holes of the pipe gallery, and complete installation. According to the traction type pipe gallery mounting method, the pipe gallery is pulled to the mounting position through the traction machine, the labor intensity of workers is reduced, the mounting efficiency is improved, meanwhile, the mounting precision of the pipe gallery is guaranteed through traction alignment of the traction machine on the pipe gallery, and the mounting quality is improved.
本发明提供一种牵引式管廊安装方法,包括如下步骤:S1,挖设基坑,并在所述基坑的始发段的两侧铺设提廊轨道,在所述基坑内沿所述基坑的长度方向铺设牵引轨道;S2,将提廊机安装于所述提廊轨道上,将牵引机安装于所述牵引轨道远离所述提廊轨道的一端;S3,通过所述提廊机对管廊进行提廊,并吊放至所述牵引轨道的落廊位置;S4,通过所述牵引机与所述管廊的牵引点连接,并将所述管廊牵引至安装位置;S5,通过所述管廊的注浆孔向所述管廊的底侧注入水泥砂浆,完成安装。本发明实现通过牵引机将管廊牵引至安装位置,降低工作人员的劳动强度,提高安装效率,同时,通过牵引机对管廊的牵引对位,保证管廊的安装精度,提高安装质量。
Traction type pipe gallery mounting method
牵引式管廊安装方法
OUYANG XIAOYONG (author) / ZHU LI (author) / MA HUABING (author) / HOU RUNFENG (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Mounting structure and mounting method of assembly type pipe gallery
European Patent Office | 2023
|European Patent Office | 2022
|Pouring and mounting method of comprehensive pipe gallery
European Patent Office | 2021
|