A platform for research: civil engineering, architecture and urbanism
Assembled steel beam supporting scaffold and segmented erecting construction method thereof
The invention provides an assembled steel beam supporting scaffold and a segmented erecting construction method thereof. The assembled steel beam supporting scaffold comprises a scaffold body and profile steel arranged in a scaffold body frame, the scaffold body comprises an upper plate, a lower plate and two rows of vertical rods used for fixing the upper plate and the lower plate, the two rows of vertical rods are arranged at the periphery of the scaffold body, and the upper plate and the lower plate are fixedly connected with the vertical rods. The assembled steel beam supporting scaffold has the beneficial effects that the stability of a supporting system in the construction process is achieved, it is guaranteed that the supporting system, a design structure and a temporary supporting beam form a stable system, one-time investment of people, materials and machines in the construction process is reduced to the maximum extent, circulation of materials and tools is increased, optimal allocation of resources is achieved, meanwhile, a quenching tower is divided into construction sections according to structural characteristic units of construction parts for segmented flow construction, so that the construction period is shortened, favorable conditions are provided for subsequent mounting of the quenching tower, and the purposes of reducing cost and increasing efficiency are achieved.
本发明提供一种组装型钢梁支撑脚手架及其分段搭设施工方法,包括脚手架主体,以及设置于所述脚手架主体框架内部的型钢,所述脚手架主体包括上板和下板,以及用于固定所述上板和所述下板的两排竖杆,两排所述竖杆设于所述脚手架主体的四周,所述下板、所述下板与所述竖杆固定连接。本发明的有益效果是:解决施工过程中支撑体系的稳定性,保证支撑体系与设计结构及临时支撑梁形成稳定体系,最大程度的减少施工过程中人材机的一次投入,加大料具的周转,实现资源优化配置,同时把熄焦塔按施工部位结构特点单元划分施工段进行分段流水施工,节缩短施工工期,为后续熄焦塔安装提供了有利条件,达到降本增效的目的。
Assembled steel beam supporting scaffold and segmented erecting construction method thereof
The invention provides an assembled steel beam supporting scaffold and a segmented erecting construction method thereof. The assembled steel beam supporting scaffold comprises a scaffold body and profile steel arranged in a scaffold body frame, the scaffold body comprises an upper plate, a lower plate and two rows of vertical rods used for fixing the upper plate and the lower plate, the two rows of vertical rods are arranged at the periphery of the scaffold body, and the upper plate and the lower plate are fixedly connected with the vertical rods. The assembled steel beam supporting scaffold has the beneficial effects that the stability of a supporting system in the construction process is achieved, it is guaranteed that the supporting system, a design structure and a temporary supporting beam form a stable system, one-time investment of people, materials and machines in the construction process is reduced to the maximum extent, circulation of materials and tools is increased, optimal allocation of resources is achieved, meanwhile, a quenching tower is divided into construction sections according to structural characteristic units of construction parts for segmented flow construction, so that the construction period is shortened, favorable conditions are provided for subsequent mounting of the quenching tower, and the purposes of reducing cost and increasing efficiency are achieved.
本发明提供一种组装型钢梁支撑脚手架及其分段搭设施工方法,包括脚手架主体,以及设置于所述脚手架主体框架内部的型钢,所述脚手架主体包括上板和下板,以及用于固定所述上板和所述下板的两排竖杆,两排所述竖杆设于所述脚手架主体的四周,所述下板、所述下板与所述竖杆固定连接。本发明的有益效果是:解决施工过程中支撑体系的稳定性,保证支撑体系与设计结构及临时支撑梁形成稳定体系,最大程度的减少施工过程中人材机的一次投入,加大料具的周转,实现资源优化配置,同时把熄焦塔按施工部位结构特点单元划分施工段进行分段流水施工,节缩短施工工期,为后续熄焦塔安装提供了有利条件,达到降本增效的目的。
Assembled steel beam supporting scaffold and segmented erecting construction method thereof
一种组装型钢梁支撑脚手架及其分段搭设施工方法
HAN XIAOQIANG (author) / YIN GAOFENG (author) / SUI XIN (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete steep slope scaffold foundation supporting device and scaffold erecting construction method
European Patent Office | 2021
|A STRUCTURE FOR ASSEMBLED SYSTEM SCAFFOLD AND ERECTING METHOD THEREOF
European Patent Office | 2015
|A structure for assembled system scaffold and erecting method thereof
European Patent Office | 2017