The invention discloses a formwork erecting method for a parapet wall. The formwork erecting method for the parapet wall is characterized by comprising the following steps that a, positioning and paying-off are conducted; b, a plurality of square timbers (3) are horizontally connected and placed in a full-length mode to serve as back ridges, and the distance between the first step of the square timbers and the bottom of a formwork is smaller than or equal to 200 mm; c, the back ridges are firmly fixed to the upper part, the middle part and the lower part of the formwork through a plurality of opposite-pull screws (2); d, a plurality of inclined strut devices (5) are arranged; e, concrete is poured into a roof floor; and f, the formwork (4) and steel pipes (1) are removed after the concrete of the parapet wall is cured to reach the strength, and reinforcing steel bars of cross-shaped reinforcing steel bar rods are cut off. The formwork erecting method for the parapet wall has the advantages that the formwork erecting structure is simple, construction is convenient, the roof parapet wall and the floor can be poured together, integrity is good, the root of the roof parapet wall has no water seepage phenomenon, a formwork supporting system is firm, the construction period is shortened, and the engineering cost is reduced.
一种女儿墙的支模方法,其特征在于包括以下步骤:a、定位放线后,b、将若干方木(3)水平连接通长放置,作为背楞,方木第一步距模板底≤200mm,c、用若干对拉螺杆(2)将背楞在模板上中下部进行固定牢靠,d、设置若干斜撑装置(5),e、屋面楼板浇筑混凝土,f、女儿墙混凝土养护到强度后,拆除模板(4)及钢管(1),将十字形钢筋杆钢筋切除。本发明的女儿墙的支模方法具有支模结构简单、施工方便,屋面女儿墙可与楼板一同浇筑,整体性好,屋面女儿墙根部无渗水现象,模板支撑体系牢靠,节约工期和降低工程成本的优点。
The invention discloses a formwork erecting method for a parapet wall. The formwork erecting method for the parapet wall is characterized by comprising the following steps that a, positioning and paying-off are conducted; b, a plurality of square timbers (3) are horizontally connected and placed in a full-length mode to serve as back ridges, and the distance between the first step of the square timbers and the bottom of a formwork is smaller than or equal to 200 mm; c, the back ridges are firmly fixed to the upper part, the middle part and the lower part of the formwork through a plurality of opposite-pull screws (2); d, a plurality of inclined strut devices (5) are arranged; e, concrete is poured into a roof floor; and f, the formwork (4) and steel pipes (1) are removed after the concrete of the parapet wall is cured to reach the strength, and reinforcing steel bars of cross-shaped reinforcing steel bar rods are cut off. The formwork erecting method for the parapet wall has the advantages that the formwork erecting structure is simple, construction is convenient, the roof parapet wall and the floor can be poured together, integrity is good, the root of the roof parapet wall has no water seepage phenomenon, a formwork supporting system is firm, the construction period is shortened, and the engineering cost is reduced.
一种女儿墙的支模方法,其特征在于包括以下步骤:a、定位放线后,b、将若干方木(3)水平连接通长放置,作为背楞,方木第一步距模板底≤200mm,c、用若干对拉螺杆(2)将背楞在模板上中下部进行固定牢靠,d、设置若干斜撑装置(5),e、屋面楼板浇筑混凝土,f、女儿墙混凝土养护到强度后,拆除模板(4)及钢管(1),将十字形钢筋杆钢筋切除。本发明的女儿墙的支模方法具有支模结构简单、施工方便,屋面女儿墙可与楼板一同浇筑,整体性好,屋面女儿墙根部无渗水现象,模板支撑体系牢靠,节约工期和降低工程成本的优点。
Formwork erecting method for parapet wall
一种女儿墙的支模方法
ZHANG ZUOWEI (author)
2021-10-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Wall single-side formwork erecting device and formwork erecting method
European Patent Office | 2022
|Pitched roof parapet wall formwork system and construction method
European Patent Office | 2024
|Formwork-free integrated rapid construction method for gutter parapet wall
European Patent Office | 2024
|