A platform for research: civil engineering, architecture and urbanism
Formwork-free integrated rapid construction method for gutter parapet wall
The invention provides a formwork-erecting-free integrated rapid construction method for a gutter parapet wall. The formwork-erecting-free integrated rapid construction method comprises the following steps that firstly, a gutter bottom formwork supporting system is installed; (2) mounting an outer template support of the parapet wall template; (3) a steel plate is laid on a joist gutter secondary beam support for gutter bottom formwork installation, a steel plate is laid on a stand column parapet wall secondary beam support plane in a sealing mode for parapet wall outer formwork installation, and shear-resistant studs are arranged on the steel plate; (4) the parapet wall and the gutter are subjected to steel bar binding, and the inner side wall of the parapet wall is subjected to single-side mold hanging; and (5) concrete pouring is conducted on the parapet wall and the gutter, and formwork-erecting-free integrated construction of the parapet wall and the gutter is completed. The template supporting system of the gutter and the template supporting system of the parapet wall form a whole, one-time pouring of concrete is guaranteed, and the problems of template expansion and grout leakage at the joint are solved. The method has the advantages of free of formwork erecting and formwork dismounting, integrated pouring, good forming effect, short construction period and the like.
本发明提供一种天沟女儿墙免支模一体化快速施工工法,包括以下步骤:步骤1)天沟底模支撑体系安装;步骤2)女儿墙模板外模板支撑安装;步骤3)于托梁天沟次梁支撑铺设钢板进行天沟底模安装,立柱女儿墙次梁支撑平面封铺钢板进行女儿墙外模板安装,并在钢板上布置抗剪栓钉;步骤4)女儿墙和天沟进行钢筋绑扎,女儿墙内侧壁采用单侧吊模;步骤5)女儿墙和天沟进行混凝土浇筑,完成女儿墙天沟免支模一体施工。本发明将天沟、女儿墙的模板支撑体系组成一个整体,保证了混凝土的一次性浇筑,也解决了涨模和交接处漏浆的问题施工。具有免支模,免拆模,一体化浇筑,成型效果好,工期短等优点。
Formwork-free integrated rapid construction method for gutter parapet wall
The invention provides a formwork-erecting-free integrated rapid construction method for a gutter parapet wall. The formwork-erecting-free integrated rapid construction method comprises the following steps that firstly, a gutter bottom formwork supporting system is installed; (2) mounting an outer template support of the parapet wall template; (3) a steel plate is laid on a joist gutter secondary beam support for gutter bottom formwork installation, a steel plate is laid on a stand column parapet wall secondary beam support plane in a sealing mode for parapet wall outer formwork installation, and shear-resistant studs are arranged on the steel plate; (4) the parapet wall and the gutter are subjected to steel bar binding, and the inner side wall of the parapet wall is subjected to single-side mold hanging; and (5) concrete pouring is conducted on the parapet wall and the gutter, and formwork-erecting-free integrated construction of the parapet wall and the gutter is completed. The template supporting system of the gutter and the template supporting system of the parapet wall form a whole, one-time pouring of concrete is guaranteed, and the problems of template expansion and grout leakage at the joint are solved. The method has the advantages of free of formwork erecting and formwork dismounting, integrated pouring, good forming effect, short construction period and the like.
本发明提供一种天沟女儿墙免支模一体化快速施工工法,包括以下步骤:步骤1)天沟底模支撑体系安装;步骤2)女儿墙模板外模板支撑安装;步骤3)于托梁天沟次梁支撑铺设钢板进行天沟底模安装,立柱女儿墙次梁支撑平面封铺钢板进行女儿墙外模板安装,并在钢板上布置抗剪栓钉;步骤4)女儿墙和天沟进行钢筋绑扎,女儿墙内侧壁采用单侧吊模;步骤5)女儿墙和天沟进行混凝土浇筑,完成女儿墙天沟免支模一体施工。本发明将天沟、女儿墙的模板支撑体系组成一个整体,保证了混凝土的一次性浇筑,也解决了涨模和交接处漏浆的问题施工。具有免支模,免拆模,一体化浇筑,成型效果好,工期短等优点。
Formwork-free integrated rapid construction method for gutter parapet wall
一种天沟女儿墙免支模一体化快速施工工法
LYU MINGYAN (author) / WANG ZIYA (author) / PEI ZESHENG (author) / XU HONGBO (author) / WU QIONGYAO (author)
2024-12-10
Patent
Electronic Resource
Chinese
Pitched roof parapet wall formwork system and construction method
European Patent Office | 2024
|Mounting joint of ALC parapet wall and gutter and construction method of mounting joint
European Patent Office | 2024
|