A platform for research: civil engineering, architecture and urbanism
Novel foundation pit soil layered settlement device and construction method thereof
The invention relates to a novel foundation pit soil body layered settlement device and a construction method thereof and relates to the field of foundation pit settlement measurement, the novel foundation pit soil body layered settlement device comprises a settlement pipe and a steel wire rope, a flange plate is fixedly connected to the end of the settlement pipe, and a settlement mark is detachably arranged on the inner wall of the flange plate; the settlement mark and the steel wire rope are detachably arranged; the inner wall of the flange plate is fixedly connected with a threaded rod, the end of the settlement mark is fixedly connected with a fixing rod, the fixing rod is sleeved with a threaded sleeve, and a clamping assembly is arranged between the threaded sleeve and the fixing rod. The device has the effect of ensuring the connection position of the settlement mark and the flange plate to be stable, ensures the connection position of the steel wire rope and the settlement mark to be stable, and greatly improves the measurement precision.
本申请涉及一种新型基坑土体分层沉降装置及其施工方法,涉及基坑沉降测量的领域,新型基坑土体分层沉降装置包括沉降管以及钢丝绳,所述沉降管端部固定连接有法兰盘,所述法兰盘内壁可拆设置有沉降标,所述沉降标与所述钢丝绳可拆设置;所述法兰盘内壁固定连接有螺纹杆,所述沉降标端部固定连接有固定杆,所述固定杆外套设有螺纹套,所述螺纹套与所述固定杆之间设置有卡接组件。本申请具有保证沉降标与法兰盘连接位置稳定的效果,同时保证钢丝绳与沉降标连接位置的稳定效果,大大提升测量精度。
Novel foundation pit soil layered settlement device and construction method thereof
The invention relates to a novel foundation pit soil body layered settlement device and a construction method thereof and relates to the field of foundation pit settlement measurement, the novel foundation pit soil body layered settlement device comprises a settlement pipe and a steel wire rope, a flange plate is fixedly connected to the end of the settlement pipe, and a settlement mark is detachably arranged on the inner wall of the flange plate; the settlement mark and the steel wire rope are detachably arranged; the inner wall of the flange plate is fixedly connected with a threaded rod, the end of the settlement mark is fixedly connected with a fixing rod, the fixing rod is sleeved with a threaded sleeve, and a clamping assembly is arranged between the threaded sleeve and the fixing rod. The device has the effect of ensuring the connection position of the settlement mark and the flange plate to be stable, ensures the connection position of the steel wire rope and the settlement mark to be stable, and greatly improves the measurement precision.
本申请涉及一种新型基坑土体分层沉降装置及其施工方法,涉及基坑沉降测量的领域,新型基坑土体分层沉降装置包括沉降管以及钢丝绳,所述沉降管端部固定连接有法兰盘,所述法兰盘内壁可拆设置有沉降标,所述沉降标与所述钢丝绳可拆设置;所述法兰盘内壁固定连接有螺纹杆,所述沉降标端部固定连接有固定杆,所述固定杆外套设有螺纹套,所述螺纹套与所述固定杆之间设置有卡接组件。本申请具有保证沉降标与法兰盘连接位置稳定的效果,同时保证钢丝绳与沉降标连接位置的稳定效果,大大提升测量精度。
Novel foundation pit soil layered settlement device and construction method thereof
一种新型基坑土体分层沉降装置及其施工方法
YANG AO (author) / LENG GANG (author) / LI XIYIN (author) / ZHANG MINGLUN (author) / YI JUNCHENG (author)
2021-10-19
Patent
Electronic Resource
Chinese
Novel foundation pit construction stable settlement method
European Patent Office | 2021
|Probabilistic Analysis of Multi-layered Soil Effects on Shallow Foundation Settlement
British Library Conference Proceedings | 2004
|Soft soil foundation settlement real-time monitoring device and method thereof
European Patent Office | 2024
|Soft soil foundation settlement prediction system for highway construction
European Patent Office | 2024
|