A platform for research: civil engineering, architecture and urbanism
Novel foundation pit construction stable settlement method
The invention relates to a novel foundation pit construction stable settlement method, and relates to the field of foundation pit construction. The novel foundation pit construction stable settlement method comprises the following steps that S1, a supporting pile is driven; S2, a waist beam is positioned; S3, a waist beam is connected; S4, a drainage well and a decompression well are excavated; S5, the gradient is detected; and S6, foundation pit excavation is finished. The novel foundation pit construction stable settlement method has the effect of conveniently adjusting the inclination of the supporting pile, the waist beam and an additional baffle are conveniently installed, the working efficiency is greatly improved, the whole operation is rapid and convenient, and the great market application effect is achieved.
本申请涉及一种新型基坑施工稳定沉降方法,涉及基坑施工的领域,其包括S1、打入支护桩;S2、定位腰梁;S3、连接腰梁;S4、开挖疏干井以及减压井;S5、检测倾斜度;S6、基坑开挖结束。本申请具有便于对支护桩倾斜度调节的效果,并且便于安装腰梁以及附加挡板,大大提升工作效率,整个操作快速便捷,具有极大的市场运用效果。
Novel foundation pit construction stable settlement method
The invention relates to a novel foundation pit construction stable settlement method, and relates to the field of foundation pit construction. The novel foundation pit construction stable settlement method comprises the following steps that S1, a supporting pile is driven; S2, a waist beam is positioned; S3, a waist beam is connected; S4, a drainage well and a decompression well are excavated; S5, the gradient is detected; and S6, foundation pit excavation is finished. The novel foundation pit construction stable settlement method has the effect of conveniently adjusting the inclination of the supporting pile, the waist beam and an additional baffle are conveniently installed, the working efficiency is greatly improved, the whole operation is rapid and convenient, and the great market application effect is achieved.
本申请涉及一种新型基坑施工稳定沉降方法,涉及基坑施工的领域,其包括S1、打入支护桩;S2、定位腰梁;S3、连接腰梁;S4、开挖疏干井以及减压井;S5、检测倾斜度;S6、基坑开挖结束。本申请具有便于对支护桩倾斜度调节的效果,并且便于安装腰梁以及附加挡板,大大提升工作效率,整个操作快速便捷,具有极大的市场运用效果。
Novel foundation pit construction stable settlement method
一种新型基坑施工稳定沉降方法
YANG AO (author) / LENG GANG (author) / CHEN CHANGSHENG (author) / MEI SHUHENG (author)
2021-10-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction engineering foundation settlement monitoring method
European Patent Office | 2020
|Foundation anti-settlement structure and construction method
European Patent Office | 2020
|Novel foundation pit soil layered settlement device and construction method thereof
European Patent Office | 2021
|Engineering construction pile foundation settlement monitoring system
European Patent Office | 2023
|Anti-settlement foundation for building construction road
European Patent Office | 2023
|