Construction system and construction method for concrete levee crown
The invention relates to a construction system and construction method for a concrete levee crown, and relates to the technical field of concrete dams. The construction system comprises a frame body, wherein a formwork set is mounted on the frame body, the formwork set comprises a first formwork, a second formwork, a third formwork and a fourth formwork, wherein the first formwork and the second formwork are mounted on the two sides of a gravity wall, and the third formwork and the fourth formwork are mounted on the two sides of a wave wall; the second formwork and the fourth formwork are fixedly connected, a first driving device for driving the first formwork to move towards the side deviating from the second formwork is arranged on the frame body, and a second driving device for driving the third formwork to move towards the side deviating from the fourth formwork is further arranged on the frame body; and a third driving device for driving the second formwork and the fourth formwork to move towards the side deviating from the first formwork is further arranged on the frame body, and a self-walking device for driving the frame body to move in the length direction of a breakwater is further arranged on the lower side of the frame body. The construction system and construction method for the concrete levee crown have the effect of shortening the construction time.
本申请涉及一种混凝土堤顶的施工系统及施工方法,涉及混凝土堤坝的技术领域,其包括架体,所述架体上安装有模板组,所述模板组包括安装在重力墙两侧的第一模板和第二模板,以及安装在防浪墙两侧的第三模板和第四模板,所述第二模板和第四模板固定连接,所述架体上设置有驱动第一模板向背离第二模板一侧移动的第一驱动装置,所述架体上还设置有驱动第三模板向背离第四模板一侧移动的第二驱动装置,所述架体上还设置有驱动第二模板和第四模板向背离第一模板一侧移动的第三驱动装置,所述架体下侧还设置有驱动架体沿防波堤长度方向移动的自行走装置。本申请具有缩短施工时间的效果。
Construction system and construction method for concrete levee crown
The invention relates to a construction system and construction method for a concrete levee crown, and relates to the technical field of concrete dams. The construction system comprises a frame body, wherein a formwork set is mounted on the frame body, the formwork set comprises a first formwork, a second formwork, a third formwork and a fourth formwork, wherein the first formwork and the second formwork are mounted on the two sides of a gravity wall, and the third formwork and the fourth formwork are mounted on the two sides of a wave wall; the second formwork and the fourth formwork are fixedly connected, a first driving device for driving the first formwork to move towards the side deviating from the second formwork is arranged on the frame body, and a second driving device for driving the third formwork to move towards the side deviating from the fourth formwork is further arranged on the frame body; and a third driving device for driving the second formwork and the fourth formwork to move towards the side deviating from the first formwork is further arranged on the frame body, and a self-walking device for driving the frame body to move in the length direction of a breakwater is further arranged on the lower side of the frame body. The construction system and construction method for the concrete levee crown have the effect of shortening the construction time.
本申请涉及一种混凝土堤顶的施工系统及施工方法,涉及混凝土堤坝的技术领域,其包括架体,所述架体上安装有模板组,所述模板组包括安装在重力墙两侧的第一模板和第二模板,以及安装在防浪墙两侧的第三模板和第四模板,所述第二模板和第四模板固定连接,所述架体上设置有驱动第一模板向背离第二模板一侧移动的第一驱动装置,所述架体上还设置有驱动第三模板向背离第四模板一侧移动的第二驱动装置,所述架体上还设置有驱动第二模板和第四模板向背离第一模板一侧移动的第三驱动装置,所述架体下侧还设置有驱动架体沿防波堤长度方向移动的自行走装置。本申请具有缩短施工时间的效果。
Construction system and construction method for concrete levee crown
一种混凝土堤顶的施工系统及施工方法
HU XIANPING (author)
2021-10-22
Patent
Electronic Resource
Chinese
Concrete slabs in levee construction
Engineering Index Backfile | 1912
|LEVEE STRUCTURE AND CONSTRUCTION METHOD OF LEVEE STRUCTURE
European Patent Office | 2021
|LEVEE BODY, LEVEE BODY CONSTITUTING MEMBER AND CONSTRUCTION METHOD OF LEVEE BODY
European Patent Office | 2015
|CONSTRUCTION DEVICE OF LEVEE WATERPROOF WALL AND CONSTRUCTION METHOD OF LEVEE WATERPROOF WALL
European Patent Office | 2020
|