A platform for research: civil engineering, architecture and urbanism
Plateau area power iron tower foundation construction method
The invention discloses a plateau area power iron tower foundation construction method, and belongs to the technical field of power construction. The method can solve the problems of great damage to vegetation in a construction area, large construction amount, inconvenience in construction, time and labor waste, low construction efficiency and labor and material waste of a traditional foundation construction method. The method comprises the steps of construction plane arrangement, material stacking, topsoil and spoil treatment, manual foundation pit excavation, fore shaft and retaining wall pouring, reinforcement cage manufacturing, foundation pouring, vegetation recovery, foundation cap manufacturing and foundation maintenance. The method completely adapts to environmental conditions of plateau areas such as Sichuan and Tibet, and is beneficial to energy conservation and environmental protection; the damage to the plateau environment is greatly reduced; and the foundation quality is ensured, and the construction safety is improved.
一种高原地区电力铁塔基础施工方法,属于电力施工技术领域,可解决传统基础施工方法对施工区域植被破坏大,施工量大、施工不便、费时费力、施工效率低、费工费料的问题,包括施工平面布置、材料码放、表土和弃土处理、人工开挖基坑、锁口和护壁浇制、钢筋笼制作、基础浇筑、植被恢复、基础帽制作、基础养护。本发明完全适应川藏等高原地区的环境条件,有利于节能环保。极大地减小了对高原环境的破坏。确保了基础质量,提高了施工安全性。
Plateau area power iron tower foundation construction method
The invention discloses a plateau area power iron tower foundation construction method, and belongs to the technical field of power construction. The method can solve the problems of great damage to vegetation in a construction area, large construction amount, inconvenience in construction, time and labor waste, low construction efficiency and labor and material waste of a traditional foundation construction method. The method comprises the steps of construction plane arrangement, material stacking, topsoil and spoil treatment, manual foundation pit excavation, fore shaft and retaining wall pouring, reinforcement cage manufacturing, foundation pouring, vegetation recovery, foundation cap manufacturing and foundation maintenance. The method completely adapts to environmental conditions of plateau areas such as Sichuan and Tibet, and is beneficial to energy conservation and environmental protection; the damage to the plateau environment is greatly reduced; and the foundation quality is ensured, and the construction safety is improved.
一种高原地区电力铁塔基础施工方法,属于电力施工技术领域,可解决传统基础施工方法对施工区域植被破坏大,施工量大、施工不便、费时费力、施工效率低、费工费料的问题,包括施工平面布置、材料码放、表土和弃土处理、人工开挖基坑、锁口和护壁浇制、钢筋笼制作、基础浇筑、植被恢复、基础帽制作、基础养护。本发明完全适应川藏等高原地区的环境条件,有利于节能环保。极大地减小了对高原环境的破坏。确保了基础质量,提高了施工安全性。
Plateau area power iron tower foundation construction method
一种高原地区电力铁塔基础施工方法
LI JIARUI (author) / LI TIANDE (author) / LI WEIBO (author) / GAO XIAOWEI (author) / NIU TENGFEI (author) / ZHENG YUCHUN (author) / WANG XIAODONG (author) / DENG PENGCHENG (author) / REN YUDI (author)
2021-10-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Conical column type iron tower foundation in plateau frozen soil area
European Patent Office | 2022
|Salt lake area power transmission line iron tower foundation construction method
European Patent Office | 2021
|Construction device of iron tower foundation and construction method of iron tower foundation
European Patent Office | 2024
|Mountainous area power transmission line iron tower foundation construction equipment and method
European Patent Office | 2023
|