Mountainous area power transmission line iron tower foundation construction equipment and method
The invention discloses construction equipment and method for a power transmission line iron tower foundation in a mountainous area, the construction method comprises two working conditions of drilling an anchor rod hole with the diameter of phi 90-150 mm and excavating a large-diameter base hole, and drilling of the anchor rod hole with the diameter of phi 90-150 mm is completed by directly utilizing a pneumatic down-the-hole impact hammer in the state that a drill arm is used; the large-diameter base hole excavation comprises the following steps that (1) according to the diameter requirement of an excavated foundation pit, circumferential drilling is completed through a drilling machine, and rock needing to be excavated in the middle is isolated from surrounding rock; (2) a drill arm is replaced with a mechanical arm, a breaking hammer is installed, and middle rock is broken; (3) the breaking hammer is replaced by a grab bucket, and broken stones are grabbed out; and (4) the step (2) and the step (3) are repeated until the foundation pit with the set depth is completed. When a large-diameter base hole is excavated, the workload is large, the working efficiency can be greatly improved by utilizing the equipment, and the construction safety is guaranteed.
本发明公开了一种山区输电线路铁塔基础施工设备及方法,其施工方法包括φ90‑150mm锚杆孔钻孔和大直径基孔开挖两种工况,对于φ90‑150mm锚杆孔钻孔,是在使用钻臂状态下,直接利用气动潜孔冲击锤完成;大直径基孔开挖包括如下步骤:(1)按照开挖基坑直径要求,用钻机完成周圈钻孔,将中间需要开挖的岩石与周边岩石孤立;(2)将钻臂替换成机械臂,安装破碎锤,将中间岩石破碎;(3)将破碎锤换成抓斗,将碎石抓出;(4)重复操作步骤(2)、(3),直到完成设定深度的基坑。大直径基孔开挖时,工作量大,利用本发明的设备可以极大的提高工作效率,并且保证了施工的安全性。
Mountainous area power transmission line iron tower foundation construction equipment and method
The invention discloses construction equipment and method for a power transmission line iron tower foundation in a mountainous area, the construction method comprises two working conditions of drilling an anchor rod hole with the diameter of phi 90-150 mm and excavating a large-diameter base hole, and drilling of the anchor rod hole with the diameter of phi 90-150 mm is completed by directly utilizing a pneumatic down-the-hole impact hammer in the state that a drill arm is used; the large-diameter base hole excavation comprises the following steps that (1) according to the diameter requirement of an excavated foundation pit, circumferential drilling is completed through a drilling machine, and rock needing to be excavated in the middle is isolated from surrounding rock; (2) a drill arm is replaced with a mechanical arm, a breaking hammer is installed, and middle rock is broken; (3) the breaking hammer is replaced by a grab bucket, and broken stones are grabbed out; and (4) the step (2) and the step (3) are repeated until the foundation pit with the set depth is completed. When a large-diameter base hole is excavated, the workload is large, the working efficiency can be greatly improved by utilizing the equipment, and the construction safety is guaranteed.
本发明公开了一种山区输电线路铁塔基础施工设备及方法,其施工方法包括φ90‑150mm锚杆孔钻孔和大直径基孔开挖两种工况,对于φ90‑150mm锚杆孔钻孔,是在使用钻臂状态下,直接利用气动潜孔冲击锤完成;大直径基孔开挖包括如下步骤:(1)按照开挖基坑直径要求,用钻机完成周圈钻孔,将中间需要开挖的岩石与周边岩石孤立;(2)将钻臂替换成机械臂,安装破碎锤,将中间岩石破碎;(3)将破碎锤换成抓斗,将碎石抓出;(4)重复操作步骤(2)、(3),直到完成设定深度的基坑。大直径基孔开挖时,工作量大,利用本发明的设备可以极大的提高工作效率,并且保证了施工的安全性。
Mountainous area power transmission line iron tower foundation construction equipment and method
一种山区输电线路铁塔基础施工设备及方法
MA JIAN (author) / XU JUNYUE (author) / JING XIN (author) / HU XUGUANG (author) / XU GANG (author) / LIU YI (author) / YAO YUHUI (author) / LI WENWU (author) / HUA XIANHONG (author) / YANG JIE (author)
2023-03-31
Patent
Electronic Resource
Chinese
Mountainous area power transmission tower composite foundation and construction method
European Patent Office | 2024
|European Patent Office | 2024
|Power transmission line iron tower foundation construction method
European Patent Office | 2023
|Salt lake area power transmission line iron tower foundation construction method
European Patent Office | 2021
|Construction method for high-low leg foundation of power transmission tower in mountainous area
European Patent Office | 2024
|