Method for pre-burying corrugated pipe in top plate
The invention relates to a method for pre-burying a corrugated pipe in a top plate. The method comprises the following steps that (1) a positioning plate of the corrugated pipe is customized according to the size of a lower collet groove; (2) a cross center control line is marked on the positioning plate by using an ink line; (3) after a top plate formwork is erected, corrugated pipe positioning grid lines are drawn on the top plate formwork; the cross center line of the positioning plate are aligned with the positioning grid lines on the top plate formwork respectively; the positioning plate is fixed on the top plate formwork; (4) the groove of the lower collet of the corrugated pipe is buckled on the positioning plate; (5) a reinforcing mesh is bound; the lower part and the lower part of the corrugated pipe are clamped by longitudinal ribs; (6) a wire is hung to adjust the upper position of the corrugated pipe, and the positioning of the corrugated pipe is determined; upper and lower reinforcing meshes of the top plate are welded with corrugated pipe joints; (7) the top plate is poured, the lower surface elevation of the top plate is the contact face of the top plate formwork and the positioning plate, and the upper surface elevation of the top plate is the height of the upper collet of the corrugated pipe. The method for pre-burying the corrugated pipe in the top plate has the characteristics of being high in accuracy, easy and convenient to operate and not prone to deformation, and positioning and fixing of the corrugated pipe can be rapidly and accurately installed.
本发明涉及一种顶板预埋波纹管的方法,1)根据下底托凹槽的大小定制波纹管的定位板;2)在定位板上用墨线标注十字中心控制线;3)第三步,顶板模板支设完成后,在顶板模板上画出波纹管定位网格线;将定位板的十字中心线与顶板模板上的定位网格线分别对正;定位板固定于顶板模板之上;4)波纹管下底托的凹槽扣在定位板上;5)绑扎钢筋网;纵筋卡固波纹管下部和下部;6)挂线调整波纹管上部位置,确定波纹管定位;将顶板上、下钢筋网与波纹管节点焊死;7)浇筑顶板,顶板下表面标高为顶板模板与定位板接触面,顶板上表面标高为波纹管上底托高度,本发明具有准确率高、操作简单便捷、不易变形的特点,能快速精准的安装波纹管的定位固定。
Method for pre-burying corrugated pipe in top plate
The invention relates to a method for pre-burying a corrugated pipe in a top plate. The method comprises the following steps that (1) a positioning plate of the corrugated pipe is customized according to the size of a lower collet groove; (2) a cross center control line is marked on the positioning plate by using an ink line; (3) after a top plate formwork is erected, corrugated pipe positioning grid lines are drawn on the top plate formwork; the cross center line of the positioning plate are aligned with the positioning grid lines on the top plate formwork respectively; the positioning plate is fixed on the top plate formwork; (4) the groove of the lower collet of the corrugated pipe is buckled on the positioning plate; (5) a reinforcing mesh is bound; the lower part and the lower part of the corrugated pipe are clamped by longitudinal ribs; (6) a wire is hung to adjust the upper position of the corrugated pipe, and the positioning of the corrugated pipe is determined; upper and lower reinforcing meshes of the top plate are welded with corrugated pipe joints; (7) the top plate is poured, the lower surface elevation of the top plate is the contact face of the top plate formwork and the positioning plate, and the upper surface elevation of the top plate is the height of the upper collet of the corrugated pipe. The method for pre-burying the corrugated pipe in the top plate has the characteristics of being high in accuracy, easy and convenient to operate and not prone to deformation, and positioning and fixing of the corrugated pipe can be rapidly and accurately installed.
本发明涉及一种顶板预埋波纹管的方法,1)根据下底托凹槽的大小定制波纹管的定位板;2)在定位板上用墨线标注十字中心控制线;3)第三步,顶板模板支设完成后,在顶板模板上画出波纹管定位网格线;将定位板的十字中心线与顶板模板上的定位网格线分别对正;定位板固定于顶板模板之上;4)波纹管下底托的凹槽扣在定位板上;5)绑扎钢筋网;纵筋卡固波纹管下部和下部;6)挂线调整波纹管上部位置,确定波纹管定位;将顶板上、下钢筋网与波纹管节点焊死;7)浇筑顶板,顶板下表面标高为顶板模板与定位板接触面,顶板上表面标高为波纹管上底托高度,本发明具有准确率高、操作简单便捷、不易变形的特点,能快速精准的安装波纹管的定位固定。
Method for pre-burying corrugated pipe in top plate
顶板预埋波纹管的方法
SUN XIAOTAO (author) / WANG GUOLIANG (author) / WANG ZHIGUANG (author)
2021-10-22
Patent
Electronic Resource
Chinese
DRAINAGE PIPE BURYING DEVICE AND DRAINAGE PIPE BURYING METHOD
European Patent Office | 2021
|BURYING DEVICE AND BURYING METHOD FOR ENVIRONMENTALLY FRIENDLY PIPE ANCHOR
European Patent Office | 2019
|