STEEL PIPE PILE BURYING METHOD
The present invention strengthens ground. In a holder installation step, a crushed stone group 2 is installed on the surface of ground G where a steel pipe pile 1 is driven, such that one end-section opening of the crushed stone group holder 2 is in contact with the surface of the ground G. In a crushed stone group introduction step, a crushed stone group 3 is introduced into the crushed stone group holder 2 installed on the surface of the ground G in the holder installation step. In a subsequent driving step, the crushed stone group 3 in the crushed stone group holder 2 is pushed downward by a circumferential blade 13 during a process of driving the steel pipe pile 1 into the ground G by means of a tip blade 12 by turning the steel pipe pile 1 in a positive direction.
La présente invention permet de renforcer le sol. Dans une étape d'installation d'élément de support, un groupe de pierres concassées (2) est installé sur la surface du sol G où un pieu tubulaire en acier (1) est battu, de telle sorte qu'une ouverture de section d'extrémité de l'élément de support de groupe de pierres concassées (2) entre en contact avec la surface du sol G. Dans une étape d'introduction de groupe de pierres concassées, un groupe de pierres concassées (3) est introduit dans l'élément de support de groupe de pierres concassées (2) installé sur la surface du sol G lors de l'étape d'installation d'élément de support. Dans une étape de battage ultérieure, le groupe de pierres concassées (3) dans l'élément de support (2) de groupe de pierres concassées est poussé vers le bas par une lame circonférentielle (13) pendant un processus de battage du pieu tubulaire en acier (1) dans le sol G au moyen d'une lame de pointe (12) par rotation du pieu tubulaire en acier (1) dans un sens positif.
地盤を強固にする。ホルダ設置ステップでは、砕石群ホルダ2の一方の端部開口が地盤Gの表面と接面するように、砕石群ホルダ2を鋼管杭1が掘進する地盤Gの表面に設置する。砕石群投入ステップでは、ホルダ設置ステップによって地盤Gの表面に設置された砕石群ホルダ2内に砕石群3を投入する。その後の掘進ステップにおいて、鋼管杭1を正回転させることにより、先端翼12によって鋼管杭1を地盤G内に掘進させる過程で、周面翼13によって砕石群ホルダ2内の砕石群3を下方に押し下げる。
STEEL PIPE PILE BURYING METHOD
The present invention strengthens ground. In a holder installation step, a crushed stone group 2 is installed on the surface of ground G where a steel pipe pile 1 is driven, such that one end-section opening of the crushed stone group holder 2 is in contact with the surface of the ground G. In a crushed stone group introduction step, a crushed stone group 3 is introduced into the crushed stone group holder 2 installed on the surface of the ground G in the holder installation step. In a subsequent driving step, the crushed stone group 3 in the crushed stone group holder 2 is pushed downward by a circumferential blade 13 during a process of driving the steel pipe pile 1 into the ground G by means of a tip blade 12 by turning the steel pipe pile 1 in a positive direction.
La présente invention permet de renforcer le sol. Dans une étape d'installation d'élément de support, un groupe de pierres concassées (2) est installé sur la surface du sol G où un pieu tubulaire en acier (1) est battu, de telle sorte qu'une ouverture de section d'extrémité de l'élément de support de groupe de pierres concassées (2) entre en contact avec la surface du sol G. Dans une étape d'introduction de groupe de pierres concassées, un groupe de pierres concassées (3) est introduit dans l'élément de support de groupe de pierres concassées (2) installé sur la surface du sol G lors de l'étape d'installation d'élément de support. Dans une étape de battage ultérieure, le groupe de pierres concassées (3) dans l'élément de support (2) de groupe de pierres concassées est poussé vers le bas par une lame circonférentielle (13) pendant un processus de battage du pieu tubulaire en acier (1) dans le sol G au moyen d'une lame de pointe (12) par rotation du pieu tubulaire en acier (1) dans un sens positif.
地盤を強固にする。ホルダ設置ステップでは、砕石群ホルダ2の一方の端部開口が地盤Gの表面と接面するように、砕石群ホルダ2を鋼管杭1が掘進する地盤Gの表面に設置する。砕石群投入ステップでは、ホルダ設置ステップによって地盤Gの表面に設置された砕石群ホルダ2内に砕石群3を投入する。その後の掘進ステップにおいて、鋼管杭1を正回転させることにより、先端翼12によって鋼管杭1を地盤G内に掘進させる過程で、周面翼13によって砕石群ホルダ2内の砕石群3を下方に押し下げる。
STEEL PIPE PILE BURYING METHOD
PROCÉDÉ D'ENFOUISSEMENT DE PIEU TUBULAIRE EN ACIER
鋼管杭の埋設方法
KOBAYASHI TOSHIO (author) / KASAHARA YASUHIRO (author)
2021-08-05
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD FOR BURYING UNDERGROUND HEAT EXCHANGER IN STEEL PIPE PILE
European Patent Office | 2016
|