A platform for research: civil engineering, architecture and urbanism
The invention discloses a one-step forming construction method for a curb foundation of an asphalt concrete road. The one-step forming construction method is characterized by comprising the following steps of a, manufacturing a template, b, tamping roadbed plain soil, c, pouring and curing concrete, d, laying 30-thickness 1: 3 dry and hard cement mortar, and installing curb stones in place, and e, laying concrete on the back side of the curb stones. Compared with a traditional curb stone construction method, the one-step forming construction method for the curb stone foundation of the asphalt concrete road has the advantages that the curb stone foundation is formed at a time during municipal road concrete construction, curb stone foundation construction after road concrete construction is completed is avoided, a large amount of labor and construction period are saved, the curb foundation and the road concrete roadbed form a whole, the overall stability of the curb is good, the curb cannot be settled and damaged in the later period, and meanwhile it is guaranteed that the curb is integrally formed and attractive after construction is completed.
一种沥青混凝土道路路缘石基础一次成型施工方法,其特征在于包括以下步骤:a、制作模板,b、路基素土夯实,c、浇筑、养护混凝土,d、敷设30厚1:3干硬性水泥砂浆,安装路沿石到位,e、敷设路沿石背侧混凝土。本发明的沥青混凝土道路路缘石基础一次成型施工方法具有与传统路沿石施工方法相比,在市政道路混凝土施工同时使路缘石基础一次成型,避免道路混凝土施工完成后再进行路缘石基础施工,节省大量人工和工期,路缘石基础与道路混凝土路基形成一体,路缘石整体稳固性好,后期路缘石不会发生沉降及破坏,同时确保路缘石施工完成后整体成型美观的优点。
The invention discloses a one-step forming construction method for a curb foundation of an asphalt concrete road. The one-step forming construction method is characterized by comprising the following steps of a, manufacturing a template, b, tamping roadbed plain soil, c, pouring and curing concrete, d, laying 30-thickness 1: 3 dry and hard cement mortar, and installing curb stones in place, and e, laying concrete on the back side of the curb stones. Compared with a traditional curb stone construction method, the one-step forming construction method for the curb stone foundation of the asphalt concrete road has the advantages that the curb stone foundation is formed at a time during municipal road concrete construction, curb stone foundation construction after road concrete construction is completed is avoided, a large amount of labor and construction period are saved, the curb foundation and the road concrete roadbed form a whole, the overall stability of the curb is good, the curb cannot be settled and damaged in the later period, and meanwhile it is guaranteed that the curb is integrally formed and attractive after construction is completed.
一种沥青混凝土道路路缘石基础一次成型施工方法,其特征在于包括以下步骤:a、制作模板,b、路基素土夯实,c、浇筑、养护混凝土,d、敷设30厚1:3干硬性水泥砂浆,安装路沿石到位,e、敷设路沿石背侧混凝土。本发明的沥青混凝土道路路缘石基础一次成型施工方法具有与传统路沿石施工方法相比,在市政道路混凝土施工同时使路缘石基础一次成型,避免道路混凝土施工完成后再进行路缘石基础施工,节省大量人工和工期,路缘石基础与道路混凝土路基形成一体,路缘石整体稳固性好,后期路缘石不会发生沉降及破坏,同时确保路缘石施工完成后整体成型美观的优点。
One-step forming construction method for curb foundation of asphalt concrete road
一种沥青混凝土道路路缘石基础一次成型施工方法
LIAO YONG (author)
2021-10-26
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Bituminous concrete road curb foundation forming construction equipment
European Patent Office | 2022
|Bituminous concrete road curb foundation forming construction equipment
European Patent Office | 2023
|CONCRETE CURB, CURB STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2016
|Light sandwich concrete road curb structure and construction method
European Patent Office | 2020
|