A platform for research: civil engineering, architecture and urbanism
Hoisting equipment for construction site
The embodiment of the invention discloses hoisting equipment for a construction site, and relates to the technical field of hoisting equipment, in particular to the hoisting equipment for the construction site. The hoisting equipment comprises two groups of main body supporting bases, first-stage vertical supporting arms, two second-stage vertical supporting arms and a main body cross beam positioned at the top of the second-stage vertical supporting arm; and the two second-stage vertical supporting arms are fixedly installed at the bottom of the main body cross beam, and the first-stage vertical supporting arms are movably installed at the bottom ends of the second-stage vertical supporting arms. According to the hoisting equipment for the construction site, two groups of wire twisting discs at the top of the main body cross beam drive a first-stage hoisting cable to rotate to hoist the equipment, the hoisting stability is improved, the position of the first-stage hoisting cable is limited through multi-stage telescopic rods on the left side and the right side during hoisting, the first-stage hoisting cable is prevented from shaking during hoisting, the stability during equipment hoisting is further improved, falling caused by too large shaking amplitude of the equipment is prevented, and the safety is improved.
本申请实施例公开了一种用于施工现场的吊装设备,涉及吊装设备技术领域,具体为一种用于施工现场的吊装设备,包括两组主体支撑基座、一级立式支撑臂、二级立式支撑臂以及位于二级立式支撑臂顶部的主体横梁,所述主体横梁的底部固定安装有两个二级立式支撑臂,且二级立式支撑臂的底端活动安装有一级立式支撑臂。该用于施工现场的吊装设备,通过主体横梁顶部的两组绞线盘带动一级吊装缆绳转动对设备进行吊装,提高了吊装的稳定性,且在吊装时通过左右侧的多级伸缩杆对一级吊装缆绳位置进行限制,防止一级吊装缆绳在吊装时晃动,进一步提高了设备吊装时的稳定性,防止设备晃动幅度过大导致掉落,提高了安全性。
Hoisting equipment for construction site
The embodiment of the invention discloses hoisting equipment for a construction site, and relates to the technical field of hoisting equipment, in particular to the hoisting equipment for the construction site. The hoisting equipment comprises two groups of main body supporting bases, first-stage vertical supporting arms, two second-stage vertical supporting arms and a main body cross beam positioned at the top of the second-stage vertical supporting arm; and the two second-stage vertical supporting arms are fixedly installed at the bottom of the main body cross beam, and the first-stage vertical supporting arms are movably installed at the bottom ends of the second-stage vertical supporting arms. According to the hoisting equipment for the construction site, two groups of wire twisting discs at the top of the main body cross beam drive a first-stage hoisting cable to rotate to hoist the equipment, the hoisting stability is improved, the position of the first-stage hoisting cable is limited through multi-stage telescopic rods on the left side and the right side during hoisting, the first-stage hoisting cable is prevented from shaking during hoisting, the stability during equipment hoisting is further improved, falling caused by too large shaking amplitude of the equipment is prevented, and the safety is improved.
本申请实施例公开了一种用于施工现场的吊装设备,涉及吊装设备技术领域,具体为一种用于施工现场的吊装设备,包括两组主体支撑基座、一级立式支撑臂、二级立式支撑臂以及位于二级立式支撑臂顶部的主体横梁,所述主体横梁的底部固定安装有两个二级立式支撑臂,且二级立式支撑臂的底端活动安装有一级立式支撑臂。该用于施工现场的吊装设备,通过主体横梁顶部的两组绞线盘带动一级吊装缆绳转动对设备进行吊装,提高了吊装的稳定性,且在吊装时通过左右侧的多级伸缩杆对一级吊装缆绳位置进行限制,防止一级吊装缆绳在吊装时晃动,进一步提高了设备吊装时的稳定性,防止设备晃动幅度过大导致掉落,提高了安全性。
Hoisting equipment for construction site
一种用于施工现场的吊装设备
ZHAO XIN (author) / WANG WENGANG (author) / ZHANG YULIANG (author) / SUN LIANG (author) / LIANG WEIDONG (author) / WANG BO (author) / WANG SHIKAI (author) / ZHU FENG (author)
2021-10-29
Patent
Electronic Resource
Chinese
Steel structure hoisting equipment for green construction site
European Patent Office | 2024
|