A platform for research: civil engineering, architecture and urbanism
Steel structure hoisting equipment for green construction site
The invention discloses a green construction site steel structure hoisting device which comprises a base, a supporting column, a supporting seat, a connecting rod and a fixing part, the supporting seat is connected to the base through the supporting column, the connecting rod is connected to one side of the supporting seat, the fixing part is arranged in the base, and the connecting rod is connected with a hoisting piece. The supporting seat comprises a fixed seat and a rotating seat, the fixed seat is fixed to the top of the supporting column, the rotating seat is rotationally connected to the fixed seat, one end of the connecting rod is fixed to the rotating seat, and when the tail end of the lifting rope is connected with the lifting hook to lift a heavy object, the heavy object drives the fixing component to grasp the ground tightly, and the fixing effect is achieved. And when heavy objects are hoisted, the fixing parts can grasp the ground more tightly, so that the number of the fixing parts of the hoisting device can be reduced, and the effect of saving parts is achieved. And meanwhile, the fixing part of the equipment can be repeatedly used, the fixing part does not need to be reconfigured when the position is replaced, and the green and economical effects are achieved.
本发明公开了一种绿色建筑工地用钢结构吊装设备,包括底座、支撑柱、支撑座、连接杆以及固定部件,支撑座通过支撑柱连接于底座上,连接杆连接于支撑座的一侧,固定部件设置于底座内,连接杆连接有吊装件。支撑座包括固定座与转动座,固定座固定于支撑柱的顶部,转动座转动连接于固定座上,连接杆的一端固定于转动座,吊绳的末端连接吊钩吊装重物时,重物带动固定部件,进而使固定部件抓紧地面,起到固定效果。越是吊装重量大的重物时,固定部件越是能够抓紧地面,能够减少吊装装置的固定部件,起到节约零件的效果。同时该本设备固定部件能够重复使用,在更换位置时不需要重新配置固定部件,起到绿色节约的效果。
Steel structure hoisting equipment for green construction site
The invention discloses a green construction site steel structure hoisting device which comprises a base, a supporting column, a supporting seat, a connecting rod and a fixing part, the supporting seat is connected to the base through the supporting column, the connecting rod is connected to one side of the supporting seat, the fixing part is arranged in the base, and the connecting rod is connected with a hoisting piece. The supporting seat comprises a fixed seat and a rotating seat, the fixed seat is fixed to the top of the supporting column, the rotating seat is rotationally connected to the fixed seat, one end of the connecting rod is fixed to the rotating seat, and when the tail end of the lifting rope is connected with the lifting hook to lift a heavy object, the heavy object drives the fixing component to grasp the ground tightly, and the fixing effect is achieved. And when heavy objects are hoisted, the fixing parts can grasp the ground more tightly, so that the number of the fixing parts of the hoisting device can be reduced, and the effect of saving parts is achieved. And meanwhile, the fixing part of the equipment can be repeatedly used, the fixing part does not need to be reconfigured when the position is replaced, and the green and economical effects are achieved.
本发明公开了一种绿色建筑工地用钢结构吊装设备,包括底座、支撑柱、支撑座、连接杆以及固定部件,支撑座通过支撑柱连接于底座上,连接杆连接于支撑座的一侧,固定部件设置于底座内,连接杆连接有吊装件。支撑座包括固定座与转动座,固定座固定于支撑柱的顶部,转动座转动连接于固定座上,连接杆的一端固定于转动座,吊绳的末端连接吊钩吊装重物时,重物带动固定部件,进而使固定部件抓紧地面,起到固定效果。越是吊装重量大的重物时,固定部件越是能够抓紧地面,能够减少吊装装置的固定部件,起到节约零件的效果。同时该本设备固定部件能够重复使用,在更换位置时不需要重新配置固定部件,起到绿色节约的效果。
Steel structure hoisting equipment for green construction site
一种绿色建筑工地用钢结构吊装设备
YU XIUPING (author)
2024-09-06
Patent
Electronic Resource
Chinese
Steel structure hoisting equipment for green building construction
European Patent Office | 2023
|Steel structure hoisting device and hoisting method for green building construction
European Patent Office | 2024
|