A platform for research: civil engineering, architecture and urbanism
Basement roof settlement post-cast strip construction method
The invention discloses a basement roof settlement post-cast strip construction method. The method comprises the following steps that 101, a cover plate is designed and constructed; 102, a post-cast strip structure is designed; beam plates on the two sides of the post-cast strip belong to cantilever structures, the bottom of the roof post-cast strip is independently reinforced and supported, in order to guarantee stability and effectiveness of a supporting system, a frame body needs to be designed, and the stress safety performance of the frame body is calculated; and 103, pouring of post-cast strip concrete is carried out; and after a scaffold is built, post-cast strip closing, supporting system construction, waterproof construction, backfill construction and post-cast strip self-compacting concrete pouring are conducted in sequence, and post-cast strip construction is completed. According to the basement roof settlement post-cast strip construction method, through the design of the cover plate and the structural safety design of the two sides of the post-cast strip, the safety and stability requirements of basement roof construction are met, and water leakage of the roof is effectively reduced.
本发明公开了一种地下室顶板沉降后浇带施工方法,该方法包括如下步骤:101、盖板设计及施工;102、后浇带结构设计;后浇带两侧梁板属悬臂结构,对于顶板后浇带底部进行独立加强支撑,为保证支撑体系的稳定有效,需要做架体设计,计算其受力安全性能;103、后浇带混凝土的浇注;搭建好脚手架后,依次进行后浇带封闭、支撑体系施工、防水施工、回填土施工、后浇带自密实混凝土浇筑,完成后浇带的施工。本发明地下室顶板沉降后浇带施工方法,通过盖板的设计,和后浇带两侧的结构安全设计,解决地下室顶板施工的安全性和稳定性要求,有效减少了顶板渗漏水的产生。
Basement roof settlement post-cast strip construction method
The invention discloses a basement roof settlement post-cast strip construction method. The method comprises the following steps that 101, a cover plate is designed and constructed; 102, a post-cast strip structure is designed; beam plates on the two sides of the post-cast strip belong to cantilever structures, the bottom of the roof post-cast strip is independently reinforced and supported, in order to guarantee stability and effectiveness of a supporting system, a frame body needs to be designed, and the stress safety performance of the frame body is calculated; and 103, pouring of post-cast strip concrete is carried out; and after a scaffold is built, post-cast strip closing, supporting system construction, waterproof construction, backfill construction and post-cast strip self-compacting concrete pouring are conducted in sequence, and post-cast strip construction is completed. According to the basement roof settlement post-cast strip construction method, through the design of the cover plate and the structural safety design of the two sides of the post-cast strip, the safety and stability requirements of basement roof construction are met, and water leakage of the roof is effectively reduced.
本发明公开了一种地下室顶板沉降后浇带施工方法,该方法包括如下步骤:101、盖板设计及施工;102、后浇带结构设计;后浇带两侧梁板属悬臂结构,对于顶板后浇带底部进行独立加强支撑,为保证支撑体系的稳定有效,需要做架体设计,计算其受力安全性能;103、后浇带混凝土的浇注;搭建好脚手架后,依次进行后浇带封闭、支撑体系施工、防水施工、回填土施工、后浇带自密实混凝土浇筑,完成后浇带的施工。本发明地下室顶板沉降后浇带施工方法,通过盖板的设计,和后浇带两侧的结构安全设计,解决地下室顶板施工的安全性和稳定性要求,有效减少了顶板渗漏水的产生。
Basement roof settlement post-cast strip construction method
地下室顶板沉降后浇带施工方法
YANG YADONG (author) / ZHANG FAN (author) / SHI WEITAO (author) / HUANG JIAN (author) / LEI FALIANG (author) / MIN ZHAOHUA (author)
2021-10-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Pre-sealing construction method for basement roof settlement post-cast strip
European Patent Office | 2022
|Basement roof post-cast strip roof-returning-free structure and construction method
European Patent Office | 2021
|