A platform for research: civil engineering, architecture and urbanism
Guide pipe for mounting main reinforcements of reinforcement cage shaped like Chinese character 'pin'
The invention relates to a guide pipe for mounting main reinforcements of a reinforcement cage shaped like a Chinese character 'pin'. The guide pipe comprises a plurality of groups of reinforcement assemblies arranged in strands and a plurality of groups of spiral stirrups, wherein each reinforcement assembly comprises a first main reinforcement, a second main reinforcement and a third main reinforcement which are the same in length; each group of spiral stirrups are connected to each group of reinforcement assemblies in a sleeving manner; the second main reinforcements and the third main reinforcements are welded and fixed with each group of spiral stirrups; steel pipes are welded and fixed on the first main reinforcements and the third main reinforcements together; the steel pipes at different spiral stirrup positions are arranged in a collinear manner; and the second main reinforcements are inserted into each group of steel pipes. According to the guide pipe, the phenomenon that the main reinforcements of the reinforcement cage cannot be assembled according to the design requirements due to the limited manufacturing site of the reinforcement cage can be effectively avoided, so that normal and effective construction is ensured, the construction period is not delayed, and good benefits can be created for the society.
本申请涉及品字型钢筋笼主筋安装导向管,其包括若干组成股设置的钢筋组件及若干组螺旋箍筋,所述钢筋组件包括长度相同的第一主筋、第二主筋及第三主筋,各组所述螺旋箍筋套接在各组所述钢筋组件上,所述第二主筋及所述第三主筋与各组所述螺旋箍筋焊接固定,所述第一主筋及所述第三主筋上共同焊接固定有钢管,不同所述螺旋箍筋位置上的所述钢管共线设置,所述第二主筋插接入各组所述钢管内部。本申请可有效的节约因钢筋笼制作场地有限无法按照设计要求拼装钢筋笼主筋这一现象,从而确保施工的正常有效进行且不会耽误工期,能够为社会创造良好的效益。
Guide pipe for mounting main reinforcements of reinforcement cage shaped like Chinese character 'pin'
The invention relates to a guide pipe for mounting main reinforcements of a reinforcement cage shaped like a Chinese character 'pin'. The guide pipe comprises a plurality of groups of reinforcement assemblies arranged in strands and a plurality of groups of spiral stirrups, wherein each reinforcement assembly comprises a first main reinforcement, a second main reinforcement and a third main reinforcement which are the same in length; each group of spiral stirrups are connected to each group of reinforcement assemblies in a sleeving manner; the second main reinforcements and the third main reinforcements are welded and fixed with each group of spiral stirrups; steel pipes are welded and fixed on the first main reinforcements and the third main reinforcements together; the steel pipes at different spiral stirrup positions are arranged in a collinear manner; and the second main reinforcements are inserted into each group of steel pipes. According to the guide pipe, the phenomenon that the main reinforcements of the reinforcement cage cannot be assembled according to the design requirements due to the limited manufacturing site of the reinforcement cage can be effectively avoided, so that normal and effective construction is ensured, the construction period is not delayed, and good benefits can be created for the society.
本申请涉及品字型钢筋笼主筋安装导向管,其包括若干组成股设置的钢筋组件及若干组螺旋箍筋,所述钢筋组件包括长度相同的第一主筋、第二主筋及第三主筋,各组所述螺旋箍筋套接在各组所述钢筋组件上,所述第二主筋及所述第三主筋与各组所述螺旋箍筋焊接固定,所述第一主筋及所述第三主筋上共同焊接固定有钢管,不同所述螺旋箍筋位置上的所述钢管共线设置,所述第二主筋插接入各组所述钢管内部。本申请可有效的节约因钢筋笼制作场地有限无法按照设计要求拼装钢筋笼主筋这一现象,从而确保施工的正常有效进行且不会耽误工期,能够为社会创造良好的效益。
Guide pipe for mounting main reinforcements of reinforcement cage shaped like Chinese character 'pin'
品字型钢筋笼主筋安装导向管
XIANG XU (author) / LI XIAOQIANG (author) / HE LONG (author) / XU CHENGSHUANG (author) / YUAN YONGBIN (author) / WANG JIAYE (author) / WANG JUN (author)
2021-11-02
Patent
Electronic Resource
Chinese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Reinforcement cage with recyclable main reinforcements and manufacturing method thereof
European Patent Office | 2022
|European Patent Office | 2024
|Reinforcement cage mounting device and reinforcement cage mounting method
European Patent Office | 2024
|