A platform for research: civil engineering, architecture and urbanism
Pavement construction maintenance process
The invention relates to the technical field of pavement repair, and discloses a pavement construction maintenance process which comprises the following steps: arranging a warning device; sealing the road surface with the damaged position, namely enclosing the damaged position by using a blocking tool; forming grooves in the inner side wall of the damaged position, wherein the number of the grooves is four, and every two of the four grooves are oppositely arranged; then measuring the depth of the damaged position through a measuring scale, then measuring the distance between the opposite grooves through the measuring scale and recorded, and then welding a cross through recorded groove distance data. According to the pavement construction maintenance process, the side wall of the damaged position is grooved, the reinforcing frame matched with the groove is matched, and the reinforcing frame is assembled into the groove so that after concrete is poured, the connecting strength between the concrete and the old pavement is enhanced, the bearing capacity of the repaired pavement is higher, and thus the service life of the maintained pavement is prolonged, and resources are saved.
本发明涉及路面修复技术领域,且公开了一种路面施工养护工艺,包括以下步骤:设置警示装置;对出现损坏位置的路面进行封道,即使用阻挡工具将损坏位置围住;在出现损坏位置内侧壁进行开槽,并且使槽的数量为四个,四个槽两两相对设置;之后,用测量尺测量出损坏位置的深度,再用测量尺测量出相对的槽之间的距离,并予以记录,再通过记录的槽距数据,焊接出一个十字架。本发明所述的一种路面施工养护工艺,通过通过在损坏位置的侧壁进行开槽,再通过与槽相适配的加强架的配合,将加强架装配到槽中,使倒入混凝土之后,增强了混凝土与老路面之间的连接强度,使修理好的路面的承载能力更强,进而增加了维修后的路面的使用寿命节约资源。
Pavement construction maintenance process
The invention relates to the technical field of pavement repair, and discloses a pavement construction maintenance process which comprises the following steps: arranging a warning device; sealing the road surface with the damaged position, namely enclosing the damaged position by using a blocking tool; forming grooves in the inner side wall of the damaged position, wherein the number of the grooves is four, and every two of the four grooves are oppositely arranged; then measuring the depth of the damaged position through a measuring scale, then measuring the distance between the opposite grooves through the measuring scale and recorded, and then welding a cross through recorded groove distance data. According to the pavement construction maintenance process, the side wall of the damaged position is grooved, the reinforcing frame matched with the groove is matched, and the reinforcing frame is assembled into the groove so that after concrete is poured, the connecting strength between the concrete and the old pavement is enhanced, the bearing capacity of the repaired pavement is higher, and thus the service life of the maintained pavement is prolonged, and resources are saved.
本发明涉及路面修复技术领域,且公开了一种路面施工养护工艺,包括以下步骤:设置警示装置;对出现损坏位置的路面进行封道,即使用阻挡工具将损坏位置围住;在出现损坏位置内侧壁进行开槽,并且使槽的数量为四个,四个槽两两相对设置;之后,用测量尺测量出损坏位置的深度,再用测量尺测量出相对的槽之间的距离,并予以记录,再通过记录的槽距数据,焊接出一个十字架。本发明所述的一种路面施工养护工艺,通过通过在损坏位置的侧壁进行开槽,再通过与槽相适配的加强架的配合,将加强架装配到槽中,使倒入混凝土之后,增强了混凝土与老路面之间的连接强度,使修理好的路面的承载能力更强,进而增加了维修后的路面的使用寿命节约资源。
Pavement construction maintenance process
一种路面施工养护工艺
CAO XIAOYAN (author) / CHEN TING (author)
2021-11-05
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Pavement construction maintenance equipment and pavement maintenance method
European Patent Office | 2022
|Pavement Construction & Maintenance
Online Contents | 2001