Civil engineering pile foundation construction method
The invention discloses a civil engineering pile foundation construction method. According to the civil engineering pile foundation construction method, following machining equipment is adopted, the machining equipment comprises a bottom plate, a collecting device, a pushing device and a connecting device, the collecting device is installed in the middle of the upper end of the bottom plate and is of a cylindrical structure, the pushing device is installed on the left side of the collecting device, the lower end of the pushing device is installed on the bottom plate, and the connecting device is installed in the collecting device. The civil engineering pile foundation construction method can solve the problems that when existing equipment is used for laying steel sleeves, the laying effect is poor, efficiency is low, large machines are generally needed for hoisting, the machining efficiency of the steel sleeves is affected, meanwhile, when the existing equipment is used for recycling the steel sleeves, the steel sleeves generally need to be manually collected one by one, the labor intensity of manual operation is large, efficiency is low, the steel sleeves cannot be effectively stored and arranged, and follow-up use of the steel sleeves is not facilitated.
本发明涉及一种土木工程桩基施工方法,该土木工程桩基施工方法采用如下加工设备,该加工设备包括底板、收集装置、推料装置和连接装置,所述的底板上端中部安装有收集装置,收集装置呈圆柱形结构,收集装置左侧安装有推料装置,推料装置下端安装在底板上,收集装置内部安装有连接装置。本发明可以解决现有的设备在对钢套管进行铺设时,铺设效果差、效率低,通常需要借助大型机械进行吊运,影响钢套管的加工效率,同时现有的设备在对钢套管进行回收时,通常需要人工逐一对钢套管进行收取,人工操作劳动强度大、效率低,而且不能够有效地对钢套管进行收纳整理,不利于钢套管的后续使用等难题。
Civil engineering pile foundation construction method
The invention discloses a civil engineering pile foundation construction method. According to the civil engineering pile foundation construction method, following machining equipment is adopted, the machining equipment comprises a bottom plate, a collecting device, a pushing device and a connecting device, the collecting device is installed in the middle of the upper end of the bottom plate and is of a cylindrical structure, the pushing device is installed on the left side of the collecting device, the lower end of the pushing device is installed on the bottom plate, and the connecting device is installed in the collecting device. The civil engineering pile foundation construction method can solve the problems that when existing equipment is used for laying steel sleeves, the laying effect is poor, efficiency is low, large machines are generally needed for hoisting, the machining efficiency of the steel sleeves is affected, meanwhile, when the existing equipment is used for recycling the steel sleeves, the steel sleeves generally need to be manually collected one by one, the labor intensity of manual operation is large, efficiency is low, the steel sleeves cannot be effectively stored and arranged, and follow-up use of the steel sleeves is not facilitated.
本发明涉及一种土木工程桩基施工方法,该土木工程桩基施工方法采用如下加工设备,该加工设备包括底板、收集装置、推料装置和连接装置,所述的底板上端中部安装有收集装置,收集装置呈圆柱形结构,收集装置左侧安装有推料装置,推料装置下端安装在底板上,收集装置内部安装有连接装置。本发明可以解决现有的设备在对钢套管进行铺设时,铺设效果差、效率低,通常需要借助大型机械进行吊运,影响钢套管的加工效率,同时现有的设备在对钢套管进行回收时,通常需要人工逐一对钢套管进行收取,人工操作劳动强度大、效率低,而且不能够有效地对钢套管进行收纳整理,不利于钢套管的后续使用等难题。
Civil engineering pile foundation construction method
一种土木工程桩基施工方法
GUO QINGLEI (author)
2021-11-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|