Civil engineering pile foundation construction method
The invention relates to the technical field of pile foundations, and discloses a civil engineering pile foundation construction method which comprises the following steps: 1) inspection: firstly, inspecting equipment and equipment required for construction to ensure that the equipment and the equipment can be normally used; 2) positioning: determining a central point location of a drill hole by adopting a combined measurement and repeated measurement method; (3) punching is conducted, specifically, a drilling device is used for punching the center point position measured in the step (2), and the interior of a hole is cleaned; and (4) a pile casing is installed, specifically, the pile casing is buried in the hole in the step (3). The steel sleeve has the beneficial effects that the two arc-shaped plates are connected into the steel sleeve through the multiple bolts and the multiple nuts, the steel sleeve can be disassembled and assembled, the steel sleeve can be disassembled and taken out from the outer portion of concrete, time and labor are saved in operation, concrete attached to the interior of the steel sleeve can be conveniently cleaned, and the construction efficiency is improved. And moreover, the influence on the shape of concrete is reduced, the pile foundation quality is improved, and therefore the beneficial effect of efficient construction is achieved.
本发明涉及桩基技术领域,且公开了一种土木工程桩基施工方法,包括以下步骤:1)检查:先对施工所需使用的器材和设备进行检查,确保可以正常进行使用;2)定位:通过采用联测、复测的方法确定钻孔的中心点位;3)冲孔:使用钻孔装置对步骤2)中测得的中心点位进行冲孔,并对孔内进行清理;4)安装护筒:将护筒埋设在步骤3)中的孔内。本发明的有益效果是:通过将多个螺栓与多个螺母将两个弧形板连接为钢套管,使钢套管可以进行拆装,对钢套管进行拆卸,可以从混凝土的外部取出,操作省时又省力,便于对钢套管内部附着的混凝土进行清理,而且减少了对混泥土形状所造成的影响,提高了桩基品质,从而具备高效施工的优点。
Civil engineering pile foundation construction method
The invention relates to the technical field of pile foundations, and discloses a civil engineering pile foundation construction method which comprises the following steps: 1) inspection: firstly, inspecting equipment and equipment required for construction to ensure that the equipment and the equipment can be normally used; 2) positioning: determining a central point location of a drill hole by adopting a combined measurement and repeated measurement method; (3) punching is conducted, specifically, a drilling device is used for punching the center point position measured in the step (2), and the interior of a hole is cleaned; and (4) a pile casing is installed, specifically, the pile casing is buried in the hole in the step (3). The steel sleeve has the beneficial effects that the two arc-shaped plates are connected into the steel sleeve through the multiple bolts and the multiple nuts, the steel sleeve can be disassembled and assembled, the steel sleeve can be disassembled and taken out from the outer portion of concrete, time and labor are saved in operation, concrete attached to the interior of the steel sleeve can be conveniently cleaned, and the construction efficiency is improved. And moreover, the influence on the shape of concrete is reduced, the pile foundation quality is improved, and therefore the beneficial effect of efficient construction is achieved.
本发明涉及桩基技术领域,且公开了一种土木工程桩基施工方法,包括以下步骤:1)检查:先对施工所需使用的器材和设备进行检查,确保可以正常进行使用;2)定位:通过采用联测、复测的方法确定钻孔的中心点位;3)冲孔:使用钻孔装置对步骤2)中测得的中心点位进行冲孔,并对孔内进行清理;4)安装护筒:将护筒埋设在步骤3)中的孔内。本发明的有益效果是:通过将多个螺栓与多个螺母将两个弧形板连接为钢套管,使钢套管可以进行拆装,对钢套管进行拆卸,可以从混凝土的外部取出,操作省时又省力,便于对钢套管内部附着的混凝土进行清理,而且减少了对混泥土形状所造成的影响,提高了桩基品质,从而具备高效施工的优点。
Civil engineering pile foundation construction method
一种土木工程桩基施工方法
LIANG WEIQUN (author) / LIANG WEIKE (author) / XU WEIQIN (author)
2022-08-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|