A platform for research: civil engineering, architecture and urbanism
Fabricated steel-concrete structure column-beam unbonded prestressed node structure and construction method
The invention discloses a fabricated steel-concrete structure column-beam unbonded prestressed node structure and a construction method. The construction process comprises the following steps of a, manufacturing a steel structure column; b, binding column steel bars and checking positions; c, aligning in place, and hoisting the steel structure column; d, carrying out reinforcement penetrating treatment on main reinforcements at the column-beam joints; e, installing vertical supports of the prefabricated superposed beams; f, hoisting the prefabricated superposed beam; g, connecting reinforcing steel bar grouting sleeves at post-pouring sections of the beam-column joints; h, erecting a template at a post-pouring section; i, carrying out tendon penetrating treatment and position arrangement and fixation at unbonded prestressed tendons at the joints of the column and the beam; j, connecting and grouting the steel bar sleeve in the post-cast section; k, carrying out concrete pouring on the steel-concrete structural column and the post-pouring section; l, tensioning and anchoring the unbonded prestressed tendons; m, dismantling the formwork and the supporting frame body; n, repeating the step b to the step m, and completing construction of all the steel-concrete structure column-beam unbonded prestressed joints on the same layer; o, repeating the step b to the step m until overall construction is completed; and p, carrying out overall acceptance. The steel-concrete structure column beam structure is reasonable in design, the technical scheme is feasible and effective, and the node anti-seismic property is good.
本发明公开了装配式钢‑砼结构柱梁无粘结预应力节点构造及施工方法,施工工艺:a.钢结构柱制作;b.柱钢筋绑扎、位置校核;c.对准就位,吊装钢结构柱;d.柱梁节点处主筋穿筋处理;e.预制叠合梁竖向支撑安装;f.预制叠合梁吊装;g.梁柱节点后浇段处钢筋灌浆套筒连接;h.后浇段处模板支设;i.柱梁节点处无粘结预应力筋穿筋处理及位置布设与固定;j.后浇段内钢筋套筒连接灌浆处理;k.钢‑砼结构柱及后浇段混凝土浇筑;l.无粘结预应力筋张拉与锚固;m.模板及支撑架体拆除;n.重复步骤b~步骤m,完成同层所有钢‑砼结构柱梁无粘结预应力节点施工;o.重复步骤b~步骤m,直至完成整体施工;p.整体验收。本发明钢‑砼结构柱梁结构设计合理,技术方案可行有效,节点抗震性能好。
Fabricated steel-concrete structure column-beam unbonded prestressed node structure and construction method
The invention discloses a fabricated steel-concrete structure column-beam unbonded prestressed node structure and a construction method. The construction process comprises the following steps of a, manufacturing a steel structure column; b, binding column steel bars and checking positions; c, aligning in place, and hoisting the steel structure column; d, carrying out reinforcement penetrating treatment on main reinforcements at the column-beam joints; e, installing vertical supports of the prefabricated superposed beams; f, hoisting the prefabricated superposed beam; g, connecting reinforcing steel bar grouting sleeves at post-pouring sections of the beam-column joints; h, erecting a template at a post-pouring section; i, carrying out tendon penetrating treatment and position arrangement and fixation at unbonded prestressed tendons at the joints of the column and the beam; j, connecting and grouting the steel bar sleeve in the post-cast section; k, carrying out concrete pouring on the steel-concrete structural column and the post-pouring section; l, tensioning and anchoring the unbonded prestressed tendons; m, dismantling the formwork and the supporting frame body; n, repeating the step b to the step m, and completing construction of all the steel-concrete structure column-beam unbonded prestressed joints on the same layer; o, repeating the step b to the step m until overall construction is completed; and p, carrying out overall acceptance. The steel-concrete structure column beam structure is reasonable in design, the technical scheme is feasible and effective, and the node anti-seismic property is good.
本发明公开了装配式钢‑砼结构柱梁无粘结预应力节点构造及施工方法,施工工艺:a.钢结构柱制作;b.柱钢筋绑扎、位置校核;c.对准就位,吊装钢结构柱;d.柱梁节点处主筋穿筋处理;e.预制叠合梁竖向支撑安装;f.预制叠合梁吊装;g.梁柱节点后浇段处钢筋灌浆套筒连接;h.后浇段处模板支设;i.柱梁节点处无粘结预应力筋穿筋处理及位置布设与固定;j.后浇段内钢筋套筒连接灌浆处理;k.钢‑砼结构柱及后浇段混凝土浇筑;l.无粘结预应力筋张拉与锚固;m.模板及支撑架体拆除;n.重复步骤b~步骤m,完成同层所有钢‑砼结构柱梁无粘结预应力节点施工;o.重复步骤b~步骤m,直至完成整体施工;p.整体验收。本发明钢‑砼结构柱梁结构设计合理,技术方案可行有效,节点抗震性能好。
Fabricated steel-concrete structure column-beam unbonded prestressed node structure and construction method
装配式钢-砼结构柱梁无粘结预应力节点构造及施工方法
JIANG WEIXING (author) / WANG BAOHUA (author) / XUE WEIXIANG (author) / MIAO LEI (author) / LI YUNYANG (author)
2021-11-05
Patent
Electronic Resource
Chinese
Unbonded prestressed concrete structure beam plate punching method
European Patent Office | 2021
|COLUMN BASE STRUCTURE OF UNBONDED PRECAST PRESTRESSED CONCRETE COLUMN
European Patent Office | 2022
|Fabricated unbonded prestressed 3D printing concrete beam and construction technology thereof
European Patent Office | 2022
|Construction method and structure of four-direction unbonded prestressed crossed beam-column joint
European Patent Office | 2021
|Construction method and structure of three-direction unbonded prestressed crossed beam-column joint
European Patent Office | 2021
|