Protective fence simulation column construction method
The invention discloses a protective fence simulation column construction method which comprises the following steps that: S1, the angle and span of a protective fence are measured and designed by using a ruler rod, and a foundation pit is excavated; S2, the angle and span of a simulation column are detected through a ruler rod, and the position of the foundation pit is continuously adjusted; S3, after the angle and span of the simulation column meet the design requirements, simulation installation is carried out; S4, after the foundation pit meets the requirement, the angle and the span between the two simulation columns are measured; S5, after the span and the angle meet the design requirements, the periphery of the simulation column is marked with lime lines; the simulation column is pulled out, and lime lines around the original simulation column are reserved; and S6, the operation is repeated, and the solid column is installed. According to the method, construction is simulated by using aluminum materials and wood materials with light density, the simulation column in the construction process is light and is quick and convenient to install and take out, equipment is not needed, equipment investment is reduced, and energy conservation and emission reduction are achieved. The simulation column is light, the speed of frequent trial installation is higher than that of equipment, the construction progress is increased, and the purpose of completing construction in advance is achieved.
本发明公开了一种防护栅栏模拟柱施工方法,包括:S1、用尺杆测量设计防护栅栏的角度和跨径,开始挖掘基坑;S2、采用尺杆检测模拟柱的角度和跨径,不断调整基坑位置;S3、模拟柱的角度及跨径达到设计要求后,进行模拟安装;S4、基坑达到要求后,测量两根模拟柱之间的角度和跨径;S5、待跨径和角度均满足设计要求后,在模拟柱四周用白灰线标记;拔出模拟柱,保留原模拟柱四周的白灰线;S6、重复操作,安装实体柱。本发明利用密度较轻的铝材、木材模拟施工,施工过程中的模拟柱较轻,无论安装、取出均快捷方便,不需要设备,减少了设备投入,节能减排。模拟柱较轻,频繁的试安装的速度比设备快,增加了施工进度,达到提前完成施工的目的。
Protective fence simulation column construction method
The invention discloses a protective fence simulation column construction method which comprises the following steps that: S1, the angle and span of a protective fence are measured and designed by using a ruler rod, and a foundation pit is excavated; S2, the angle and span of a simulation column are detected through a ruler rod, and the position of the foundation pit is continuously adjusted; S3, after the angle and span of the simulation column meet the design requirements, simulation installation is carried out; S4, after the foundation pit meets the requirement, the angle and the span between the two simulation columns are measured; S5, after the span and the angle meet the design requirements, the periphery of the simulation column is marked with lime lines; the simulation column is pulled out, and lime lines around the original simulation column are reserved; and S6, the operation is repeated, and the solid column is installed. According to the method, construction is simulated by using aluminum materials and wood materials with light density, the simulation column in the construction process is light and is quick and convenient to install and take out, equipment is not needed, equipment investment is reduced, and energy conservation and emission reduction are achieved. The simulation column is light, the speed of frequent trial installation is higher than that of equipment, the construction progress is increased, and the purpose of completing construction in advance is achieved.
本发明公开了一种防护栅栏模拟柱施工方法,包括:S1、用尺杆测量设计防护栅栏的角度和跨径,开始挖掘基坑;S2、采用尺杆检测模拟柱的角度和跨径,不断调整基坑位置;S3、模拟柱的角度及跨径达到设计要求后,进行模拟安装;S4、基坑达到要求后,测量两根模拟柱之间的角度和跨径;S5、待跨径和角度均满足设计要求后,在模拟柱四周用白灰线标记;拔出模拟柱,保留原模拟柱四周的白灰线;S6、重复操作,安装实体柱。本发明利用密度较轻的铝材、木材模拟施工,施工过程中的模拟柱较轻,无论安装、取出均快捷方便,不需要设备,减少了设备投入,节能减排。模拟柱较轻,频繁的试安装的速度比设备快,增加了施工进度,达到提前完成施工的目的。
Protective fence simulation column construction method
一种防护栅栏模拟柱施工方法
WU HAIJUN (author) / ZHANG ZHENXING (author) / WANG DEZHEN (author) / ZHANG ENHUI (author) / WANG MENG (author) / HUAN HENGDE (author) / WANG GUANQI (author) / SHEN FENG (author) / WANG DONGDONG (author) / ZHANG ZELIN (author)
2021-11-09
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E01B
PERMANENT WAY
,
Gleisoberbau