Pile column connection precise positioning pouring system and construction method
The invention discloses a pile column connection precise positioning pouring system and a construction method. The pile column connection precise positioning pouring system comprises a steel stand column, a drilled pile, a control frame connected to a supporting platform, a first jack connected between the control frame and the horizontal direction of the steel stand column, a second jack connected between a protective cylinder and the horizontal direction of the steel stand column, and a feeding pipe inserted into the steel stand column. During construction, by arranging the control frame, the steel stand column can be effectively borne; by arranging the supporting platform, the supporting platform can be fixedly connected through a bearing arm pre-connected to the steel stand column; by arranging the first jack and the second jack, installation is facilitated, and adjustment, clamping and fixing are facilitated; and the first jack and the second jack are jointly controlled through a verticality adjusting controller, so that cooperation and synchronous control are facilitated. Through pouring construction of different grades of concrete, the overall construction of the steel stand column and the drilled pile is guaranteed, and effective construction during concrete grade conversion and precision control in the process are guaranteed.
本发明公开了一种桩柱连接精准定位浇筑系统及施工方法,定位浇筑系统包含钢立柱、钻孔桩、连接于支承平台上的控制架、连接于控制架和钢立柱水平向之间的第一千斤顶、连接于护筒与钢立柱水平之间的第二千斤顶、连钢立柱内部插入有进料管。施工时,本发明通过控制架的设置,可有效的承载钢立柱;支承平台的设置,可通过钢立柱上预先连接的承重臂进行固定连接;通过第一千斤顶和第二千斤顶的设置,利于安装且便于调整和夹持固定;第一千斤顶和第二千斤顶均通过调垂控制仪联合控制,便于协作和同步控制;本发明通过不同等级混凝土的浇筑施工,利于保证钢立柱和钻孔桩的整体施工,保证混凝土等级转换时的有效施工和过程中的精度控制。
Pile column connection precise positioning pouring system and construction method
The invention discloses a pile column connection precise positioning pouring system and a construction method. The pile column connection precise positioning pouring system comprises a steel stand column, a drilled pile, a control frame connected to a supporting platform, a first jack connected between the control frame and the horizontal direction of the steel stand column, a second jack connected between a protective cylinder and the horizontal direction of the steel stand column, and a feeding pipe inserted into the steel stand column. During construction, by arranging the control frame, the steel stand column can be effectively borne; by arranging the supporting platform, the supporting platform can be fixedly connected through a bearing arm pre-connected to the steel stand column; by arranging the first jack and the second jack, installation is facilitated, and adjustment, clamping and fixing are facilitated; and the first jack and the second jack are jointly controlled through a verticality adjusting controller, so that cooperation and synchronous control are facilitated. Through pouring construction of different grades of concrete, the overall construction of the steel stand column and the drilled pile is guaranteed, and effective construction during concrete grade conversion and precision control in the process are guaranteed.
本发明公开了一种桩柱连接精准定位浇筑系统及施工方法,定位浇筑系统包含钢立柱、钻孔桩、连接于支承平台上的控制架、连接于控制架和钢立柱水平向之间的第一千斤顶、连接于护筒与钢立柱水平之间的第二千斤顶、连钢立柱内部插入有进料管。施工时,本发明通过控制架的设置,可有效的承载钢立柱;支承平台的设置,可通过钢立柱上预先连接的承重臂进行固定连接;通过第一千斤顶和第二千斤顶的设置,利于安装且便于调整和夹持固定;第一千斤顶和第二千斤顶均通过调垂控制仪联合控制,便于协作和同步控制;本发明通过不同等级混凝土的浇筑施工,利于保证钢立柱和钻孔桩的整体施工,保证混凝土等级转换时的有效施工和过程中的精度控制。
Pile column connection precise positioning pouring system and construction method
一种桩柱连接精准定位浇筑系统及施工方法
LI MIN (author) / WANG YONGGANG (author) / WANG HAIBO (author) / HUANG LEILEI (author) / SHI JING (author) / WEI YU (author) / ZHOU WEICHAO (author) / SHI JIAJIA (author) / ZENG FANG (author) / YANG JIANGWEN (author)
2021-11-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile-column connection accurate positioning structure and construction method