Pile pulling construction method
The invention relates to the technical field of building demolition operation, in particular to a pile pulling construction method. The pile pulling construction method comprises the following construction steps that the position where a pile needs to be pulled is determined, and a site and a water source are selected on the periphery according to pile pulling positioning; a drilling machine is in place, pile bodies are sleeved with a steel casing and sinks into the steel casing, and a tool bit at the top of the steel casing is used for cutting a soil body to rotationally sink the steel casing; a top soil body in the steel casing is impacted by using a water jet hole-forming device; and the pile bodies are taken out, and the taken-out pile bodies are stacked on the nearby ground. According to the pile pulling construction method, a steel casing and flushing operation are adopted, soil around a pile body is removed through flushing, the binding force of the soil to the pile body is reduced, flushing slurry is fixed in a casing area through the casing, it is guaranteed that the surrounding soil body cannot be polluted and damaged, the tool bit at the top of the casing cuts the soil body and stones, and clay and yellow sand are poured to prevent the soil body from collapsing to affect the construction environment.
本发明涉及建筑拆除作业的技术领域,尤其是涉及一种拔桩施工方法。本发明包括以下施工步骤:确定需拔桩的位置,根据拔桩定位在周边选取场地和水源;钻机就位,利用钢护筒套住桩体并沉入所述钢护筒,利用所述钢护筒顶部的刀头切削土体旋转下沉所述钢护筒;利用射水成孔装置冲击所述钢护筒内顶部土体;将所述桩体取出,所述取出的桩体至附近地面堆放。采用钢护筒和冲水作业,冲水将桩体周围的土壤清除,减小土壤对桩体的粘结力,护筒将冲水泥浆固定在护筒区域内,保证不会对周围土体进行污染破坏,护筒顶部刀头切割土体和石块,灌注粘土与黄砂防止土体塌陷影响施工环境。
Pile pulling construction method
The invention relates to the technical field of building demolition operation, in particular to a pile pulling construction method. The pile pulling construction method comprises the following construction steps that the position where a pile needs to be pulled is determined, and a site and a water source are selected on the periphery according to pile pulling positioning; a drilling machine is in place, pile bodies are sleeved with a steel casing and sinks into the steel casing, and a tool bit at the top of the steel casing is used for cutting a soil body to rotationally sink the steel casing; a top soil body in the steel casing is impacted by using a water jet hole-forming device; and the pile bodies are taken out, and the taken-out pile bodies are stacked on the nearby ground. According to the pile pulling construction method, a steel casing and flushing operation are adopted, soil around a pile body is removed through flushing, the binding force of the soil to the pile body is reduced, flushing slurry is fixed in a casing area through the casing, it is guaranteed that the surrounding soil body cannot be polluted and damaged, the tool bit at the top of the casing cuts the soil body and stones, and clay and yellow sand are poured to prevent the soil body from collapsing to affect the construction environment.
本发明涉及建筑拆除作业的技术领域,尤其是涉及一种拔桩施工方法。本发明包括以下施工步骤:确定需拔桩的位置,根据拔桩定位在周边选取场地和水源;钻机就位,利用钢护筒套住桩体并沉入所述钢护筒,利用所述钢护筒顶部的刀头切削土体旋转下沉所述钢护筒;利用射水成孔装置冲击所述钢护筒内顶部土体;将所述桩体取出,所述取出的桩体至附近地面堆放。采用钢护筒和冲水作业,冲水将桩体周围的土壤清除,减小土壤对桩体的粘结力,护筒将冲水泥浆固定在护筒区域内,保证不会对周围土体进行污染破坏,护筒顶部刀头切割土体和石块,灌注粘土与黄砂防止土体塌陷影响施工环境。
Pile pulling construction method
一种拔桩施工方法
SONG WENHAO (author) / SHAO ZHULING (author) / HE DENGCHAO (author) / LYU JINGANG (author) / MENG LINGFENG (author) / LI HAO (author) / GAO SHANYOU (author)
2021-11-16
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
|Loess area air bag pile pulling device and pile pulling construction method
European Patent Office | 2021
|